ligo-ex
ligo-ds
|
Richardson Lab Experimental Log, Page 11 of 13 |
Not logged in |
 |
|
New entries since: | Wed Dec 31 16:00:00 1969 | |
Wed Oct 2 13:38:00 2024, Cynthia, Update, Interferometer Simulations, cavity scan with averaged O4 ETM coating as plume  
|
Tue Feb 25 10:56:25 2025, Cynthia, Update, Interferometer Simulations, mirror coating added for simulation rerun
|
Tue Mar 4 10:18:43 2025, Cynthia, Update, Interferometer Simulations, attempted to remove curvature and tilt for the coating
|
Tue Mar 11 11:28:52 2025, Cynthia, Update, Interferometer Simulations, flattening mirror to study power discrepency
|
Tue Apr 15 11:37:17 2025, Cynthia, Update, Interferometer Simulations, Finishing up mirror coating map step
|
Tue Aug 26 12:45:41 2025, Christina, Ma, Tyler, Update, CDS, RIN Update
|
Fri Jun 27 15:38:22 2025, Christina, Update, TCS, FROSTI Reconstruction
|
Tue Jul 1 11:04:00 2025, Christina, Update, TCS, FROSTI Reconstruction II
|
Mon Jul 7 16:39:18 2025, Christina, Update, TCS, Pomona Box Drawings 
|
Thu Jul 10 16:41:18 2025, Christina, Update, TCS,  
|
Tue Jul 15 10:40:23 2025, Christina, Update, TCS,
|
Tue Jul 15 13:13:48 2025, Christina, Update, TCS, Photodetector optical post assembly
|
Tue Jul 22 12:20:29 2025, Christina, Update, TCS, 
|
Tue Jul 29 12:30:00 2025, Christina, Update, TCS, 260 hour ADC update
|
Mon Aug 11 22:19:50 2025, Christina, Update, TCS, Red Pitaya Data Streaming 
|
Tue Aug 12 13:46:56 2025, Christina, Update, , 
|
Tue Aug 19 12:08:40 2025, Christina, Update, TCS, RP Initial vs CyMAC Plot Comparisons 
|
Thu Jul 27 10:18:43 2023, Celeste, Update, TCS, Graphical Updates to HOM RH Modification
|
Fri Jul 28 17:45:45 2023, Celeste, Update, TCS, Graphical Updates to HOM RH Modification, Friday 7/28
|
Tue Aug 1 16:22:35 2023, Celeste, Update, TCS, Graphical Updates to HOM RH Modification, Tuesday 8/1
|
Thu Aug 10 14:13:38 2023, Celeste, Update, TCS, 8/10/23, Simulation Graphical Progress
|
Fri Aug 11 10:57:20 2023, Celeste, Update, TCS, 8/11/23 Simulation Progress
|
Tue Aug 15 16:10:06 2023, Celeste, Update, TCS, 8/15/2023 Simulation Progress
|
Tue Jun 3 11:54:06 2025, Cece Ochoa, Update, , CE Cavity Design Update
|
Tue Jun 21 18:31:49 2022, Cassidy and Phoebe, Update, Cameras, IR Absorbing Screen and FLIR Camera Setup  
|
Tue Jul 26 14:10:35 2022, Cassidy, Update, Cameras, Optical Post Replacement and Realignment  
|
Thu Apr 27 16:23:44 2023, Cao, Pamella and Julian, Physics, VAC, Installing vacuum system (cont.) 
|
Mon Oct 3 17:21:39 2022, Cao, Update, TCS, Inspection of macor parts 7x
|
Tue Apr 11 13:15:40 2023, Cao, Infrastructure, Clean & Bake, Nitrogen gas tank replaced
|
Wed Apr 12 16:13:19 2023, Cao, Physics, VAC, Vacuum prep and installation
|
Fri Apr 28 18:16:57 2023, Cao, Physics, VAC, Grounding vacuum system
|
Fri Apr 28 19:00:13 2023, Cao, Physics, VAC, Tighten CF ports on vacuum chamber
|
Fri Apr 28 19:39:19 2023, Cao, Summary, General, Clean and Bake Leybold TTR 91 Pirani Gauge
|
Sun May 14 15:50:48 2023, Cao, Infrastructure, Computers, High resolution display of logrus machine
|
Wed Jun 21 20:25:05 2023, Cao, Infrastructure, VAC, Vacuum chamber bake attempt 1 6x
|
Mon Jul 3 14:32:24 2023, Cao, Infrastructure, VAC, Cooling down vacuum chamber
|
Mon Jul 3 16:26:21 2023, Cao, Infrastructure, DAQ, Access and control Red Pitaya remotely and run it on local machine
|
Fri May 12 20:28:34 2023, Aiden, Cao, Physics, VAC, Vacuum chamber Helium leak test 
|
Wed Jul 5 15:46:47 2023, Aiden, Cao, Infrastructure, VAC, Vacuum Chamber Baking Update
|
Thu Jan 26 18:58:25 2023, Aiden, Update, General, Oven Heating
|
Tue Feb 7 17:27:30 2023, Aiden, Physics, ELOG, Clean and Bake Batch #1
|
Fri Feb 10 15:15:30 2023, Aiden, Update, General, Bagging First Batch
|
Mon Feb 13 18:57:53 2023, Aiden, Summary, General, Clean and Bake batch 2
|
Fri Feb 17 19:12:39 2023, Aiden, Update, General, Clean and Bake batch 3 
|
Tue Feb 21 17:51:04 2023, Aiden, Summary, General, Clean and Bake batch 4 
|
Tue Feb 28 19:37:22 2023, Aiden, Summary, General, Clean and Bake batch 5  
|
Fri Mar 3 19:13:33 2023, Aiden, Summary, General, Clean and Bake Batch 6 
|
Wed Mar 8 19:29:00 2023, Aiden, Summary, General, Clean and Bake batch 7 
|
Tue Mar 14 18:21:41 2023, Aiden, Summary, General, Clean and Bake batch 8
|
Fri Mar 17 19:46:39 2023, Aiden, Summary, General, Clean and Bake batch 9 
|
|