ligo-ex
ligo-ds
Richardson Lab Experimental Log, Page 11 of 12
Not logged in
List
|
Find
|
Login
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Configuration
Update
Summary
HowTo
Bureaucracy
Infrastructure
Physics
-- Category --
General
CDS
TCS
VAC
DAQ
Safety
Computers
Scripts/Programs
Electronics
Cameras
Wiki
ELOG
Equipment Loan
Lore
VLC Electronics
Clean & Bake
Cleanroom
VLC Update
FLIR
Measuring Noise in Interferometer
Interferometer Simulations
592 Entries
Goto page
Previous
1
,
2
,
3
...
10
, 11,
12
Next
ID
Date
Author
Type
Category
Subject
Text
51
Tue Mar 14 18:21:41 2023
Aiden
Summary
General
Clean and Bake batch 8
Starting off Peter and I refilled the deionized
water barrel.
Then Aiden Cleaned and Bake
the FROSTI arms and bases in liquinox for
52
Fri Mar 17 19:46:39 2023
Aiden
Summary
General
Clean and Bake batch 9
Bagged and Tagged the reflector arms and bases
and placed them inside the clean room. Total
of 2 bags used. Cleaned and Baked parts in
60
Mon Apr 3 17:04:05 2023
Aiden
Summary
General
IDP Scroll Pump Assembly
Aiden installed the isolation valve and the
exhaust silencer kits on the IDP-3 Scroll
pump. The entire assembly still needs to
69
Wed Apr 12 10:53:02 2023
Aiden
Summary
General
Valve Cleaning
Bagged and Tagged the parts from batch 10
and placed them inside the clean room.
Then
cleaned the last gate valve in liquinox for
72
Mon Apr 17 17:06:49 2023
Aiden
Summary
General
Clean and Bake batch 11
Cleaned the Viton O-Ring for the main chamber
in Liquinox for 10 minutes. Then put it in
the oven to back for;
1. Ramp to 100 degC
77
Mon Apr 24 17:38:45 2023
Aiden
Summary
General
Clean and Bake Batch 12
Today I Bagged and tagged the o-rings from
batch 11 and placed them inside the clean
room. I also cleaned batch 12 parts in liquinox
80
Thu Apr 27 09:48:34 2023
Aiden
Summary
General
Batch 12 Bagging
I took batch 12 out of the oven and put them
in a bag and placed the bag inside the clean
room in the first large stainless steel container.
I
96
Wed May 10 10:49:34 2023
Aiden
Update
General
RGA Software
[Aiden, Cao]
Went over how to use the RGA
software, how to change the graph units,
scaling and mass detection. Also went over
111
Wed May 31 16:18:41 2023
Aiden
Summary
General
Mock FROSTI
Finished assembly on the Mock FROSTI so it
is ready for the fit test at LIGO lab.
115
Tue Jun 6 16:04:46 2023
Aiden
Update
General
Water
Aiden went and refilled the de-ionized water
to continue clean and bake batches.
121
Tue Jun 13 13:25:05 2023
Aiden
Summary
Clean & Bake
Clean and Bake Batch 13
Cleaned and Baked the new 1.33" and 2.75"
blanks for the vacuum system. Cleaned them
with liquinox in the ultra sonic washer for
126
Fri Jun 16 17:40:28 2023
Aiden
Update
Clean & Bake
Clean and Bake Batch 14
Cleaned and Baked the new and 2.75" copper
gaskets for the vacuum system. Cleaned them
with liquinox in the ultra sonic washer for
146
Wed Jul 5 16:02:12 2023
Aiden
Update
Clean & Bake
Clean and Bake batch 14 Bagging
Bagged and Tagged the 2.75" copper gaskets
from Batch 14 and placed them into the clean
room on the work bench.
148
Thu Jul 6 16:16:03 2023
Aiden
Summary
VAC
Vacuum Chamber Baking Update
Pressure Measured Before Removing Gauge
2.31 E-7 Torr.
Went in and turned
on the heating tape in increments of 30 degC
150
Fri Jul 7 15:11:39 2023
Aiden
Update
VAC
VAC System Heating Update
The temperature of the flange connecting
to the turbo pump after reaching equilibrium
is 74 degC. This means that it is safe to
152
Mon Jul 10 13:23:23 2023
Aiden
Update
VAC
VAC System Heating Update
Checked on the system today.
The
flange on the turbo pump has reached an equilibrium
temperature of 87 degC when set at 150 degC.
153
Thu Jul 13 14:56:43 2023
Aiden
Update
VAC
VAC System Heating Update
Checked on the vacuum system today to
change the PID controls back to their default
values in order to try and get the temperature
156
Fri Jul 14 14:37:25 2023
Aiden
Update
VAC
VAC System Heating Update
Checked on the vacuum system and it looks
like it will either need to be increased
in temperature or baked for a longer time.
160
Mon Jul 17 13:50:41 2023
Aiden
Update
VAC
VAC System Heating Update
Started to cool down the chamber today.
Final temperature readings of the chamber
were 146C and 91C for the body and cross
161
Mon Jul 17 14:01:41 2023
Aiden
Update
VAC
VAC System Heating Update
The insulation on the lid of the vacuum
chamber has some discoloration and it may
be wise to place a sensor closer to this
168
Thu Jul 20 18:03:19 2023
Aiden
Update
VAC
Vacuum Chamber Baking Update
Took another set of RGA data after the
second bake has cooled down to 27 degC.
Just
by visual comparison to the other graphs,
179
Fri Jul 28 13:46:17 2023
Aiden
Update
VAC
Vacuum Chamber Baking Update
Took some more data to look at the HC
count. Initial data was from leaving the
Argon leak closed and then left it open for
184
Tue Aug 1 12:10:03 2023
Aiden
Update
VAC
Vacuum Chamber Baking Update
Dr. Richardson and I took off the insulation
on the lid again to add more insulation in-between
the heater tape folds in addition to what
185
Tue Aug 1 12:48:41 2023
Aiden
Update
Cleanroom
Pre Filter Change
Changed the pre filter inside of the
3 stage HEPA system next to the soldering
station. It was rather dirty and I have attached
188
Wed Aug 2 17:02:38 2023
Aiden
Update
VAC
VAC System Heating Update
Moved the temperature sensor on the PID
controller to one of the switch backs on
the lid.
Also started the next
189
Thu Aug 3 16:00:25 2023
Aiden
Update
VAC
VAC System Heating Update
Check on the temperature of the bake today
to see the equilibrium temperatures. With
both of the PID controllers set to 150 C,
190
Thu Aug 3 17:47:51 2023
Aiden
Update
VAC
VAC Heating System Update
Did some further testing to determine
if it was within reason to increase the temperature
of the chamber. I used a thermometer and
192
Fri Aug 4 15:21:33 2023
Aiden
Update
VAC
VAC System Heating Update
Checked on Bake 3 today and the temperature
sensors read 126 C and 91 C for the chamber
barrel and turbo pump flange respectively.
195
Tue Aug 8 15:31:26 2023
Aiden
Update
VAC
VAC Heating System Update
Vacuum Chamber equilibrium temperature
for bake 3 are 126 C and 88 C for the chamber
wall and turbo pump flange respectively.
10x
201
Thu Aug 10 14:36:00 2023
Aiden
Update
VAC
VAC System Heating Update
Came in to install one of the Full range gauges.
Checked the temperature first of the cross
and it was reading 30 C. After installing
203
Thu Aug 10 18:32:39 2023
Aiden
Update
VAC
VAC System Heating Update
[Dr. Richardson, Aiden]
DO NOT TOUCH ANY VALVES ON THE
CHAMBER. THERE IS A PRESSURE DIFFERENTIAL
205
Fri Aug 11 18:32:00 2023
Aiden
Update
VAC
VAC System Heating Update
[Dr. Richardson, Aiden] Large Update
Removed
most of the insulation on the chamber in
order to pull back some of the heater tape
11x
208
Tue Aug 15 16:04:23 2023
Aiden
Update
VAC
VAC Heating System Update
Pulled off the rest of the heater tape
along with the aluminum tape left behind.
The aluminum tape adhesive left behind a
6x
212
Thu Aug 17 15:02:44 2023
Aiden
Update
VAC
VAC Heating System Update
Put the heating tape back on and made
sure to have 4 coils around the barrel of
the chamber. To make this happen I did not
11x
213
Thu Aug 17 15:18:48 2023
Aiden
Update
VAC
VAC Heating System Update
Relocated the PID controllers so that the
heating tape could be plugged in. In the
picture the left one controls the top half
214
Mon Aug 21 17:13:25 2023
Aiden
Update
VAC
Vacuum Chamber Baking Update
Came in to take RGA data and found the
turbo pump drawing .38 Amps. This was much
higher than what it was on Friday. I investigated
215
Mon Aug 28 14:43:50 2023
Aiden
Update
VAC
Vacuum Chamber Baking Update
The PID controllers were turned off on Friday
and the chamber was left to cool over the
weekend. Just took data and it looks like
216
Tue Aug 29 19:09:21 2023
Aiden
Update
VAC
Vacuum Chamber Baking Update
Here are some more plots with the RGA data
take August 29. It seems that more pumping
time has led to the HC levels being dramatically
217
Tue Aug 29 22:07:38 2023
Aiden
Update
General
Electronic Bench
Dr Richardson is working on mounting more
power supplies in the server rack and is
using the electronics bench. Be aware to
218
Thu Aug 31 12:56:29 2023
Aiden
Update
VAC
Vacuum Chamber Baking Update
Took some more RGA data to see if the HC levels
have further declined since bake 4 and it
seems that it has started to plateau with
219
Fri Sep 1 19:21:19 2023
Aiden
Update
VAC
VAC System Heating Update
Started bake 5 today. This will hopefully
be a longer and hotter bake with it lasting
6-7 days at around 150 C. The pressure in
220
Tue Sep 5 16:43:19 2023
Aiden
Update
General
VAC System Heating Update
Checked on bake 5 today after 3 days of equilibrium.
The RGA cross is at 106 C and the turbo pump
cross is at 74 C. This was reached while
222
Fri Sep 8 16:10:43 2023
Aiden
Update
VAC
VAC System Heating Update
Turned off the PID controllers to let the
chamber cool down. Final temperatures for
the RGA cross and Turbo pump cross were 113
223
Mon Sep 11 16:02:42 2023
Aiden
Update
VAC
VAC System Heating Update
The chamber has cooled down from bake 5 and
I took the first set of data. The pressure
measured during the RGA measurements reached
224
Tue Sep 12 15:31:31 2023
Aiden
Update
Clean & Bake
Clean and Bake Batch 15
Cleaned and Baked the SS screws for the heater
mount. Check the Clean and Bake data base
on the website to get a precise list of the
226
Fri Sep 15 17:33:35 2023
Aiden
Update
VAC
Vacuum Chamber Baking Update
Took some more RGA data and see that the chamber
has gotten much cleaner since monday. Next
step would be another bake with some focus
227
Thu Sep 28 15:17:13 2023
Aiden
Update
Clean & Bake
Clean and Bake Batch 16
Bagged and Tagged the parts from batch 15
and started baking batch 16 which includes
the 6" to 8" reducer.
232
Tue Oct 3 15:07:48 2023
Aiden
Update
Clean & Bake
Clean and Bake Batch 17
Cleaned and baked all the stainless steel
parts in Batch 17. Check data base for more
details on this.
233
Sat Oct 7 17:10:27 2023
Aiden
Update
Clean & Bake
Clean and Bake Batch 18
Bagged and tagged the parts from Batch 17
and placed them in the clean room on the
optic table. Also started an aluminum batch
237
Mon Oct 9 21:41:24 2023
Aiden
Update
Clean & Bake
Clean and Bake Batch 19
Bagged and tagged the parts from batch 18.
Started the Copper batch that includes all
the gaskets needed to start the vacuum chamber