446
|
Mon Sep 23 15:00:41 2024 |
Cynthia | Update | Interferometer Simulations | corrections on assumption for O5 coating | The document recording ETM07 and ETM08 coating
(T2300093) was discussed:
the current
plume files are not necessarily correct in |
|
|
587
|
Tue Jun 3 12:16:13 2025 |
Cynthia | Update | Interferometer Simulations | Point absorber simulation on radially averaged profile | |
|
|
361
|
Mon Apr 15 15:25:10 2024 |
Cynthia | Update | Interferometer Simulations | progress on simulation so far | |
|
|
374
|
Mon Jun 3 14:59:44 2024 |
Cynthia | Update | Interferometer Simulations | Created cavity scan with LG modes | |
|
|
426
|
Mon Aug 19 07:11:55 2024 |
Cynthia | Update | Interferometer Simulations | cavity scans with FROSTI effects | |
|
|
454
|
Wed Oct 2 13:38:00 2024 |
Cynthia | Update | Interferometer Simulations | cavity scan with averaged O4 ETM coating as plume | |
  |
|
526
|
Tue Feb 25 10:56:25 2025 |
Cynthia | Update | Interferometer Simulations | mirror coating added for simulation rerun | I have tried to rerun the simulation on finesse
after adding the mirror coating. The result
has a large fluctuation in required input |
|
|
530
|
Tue Mar 4 10:18:43 2025 |
Cynthia | Update | Interferometer Simulations | attempted to remove curvature and tilt for the coating | |
|
|
540
|
Tue Mar 11 11:28:52 2025 |
Cynthia | Update | Interferometer Simulations | flattening mirror to study power discrepency | |
|
|
554
|
Tue Apr 15 11:37:17 2025 |
Cynthia | Update | Interferometer Simulations | Finishing up mirror coating map step | |
|
|
635
|
Tue Aug 26 12:45:41 2025 |
Christina, Ma, Tyler | Update | CDS | RIN Update | Slides |
|
|
600
|
Fri Jun 27 15:38:22 2025 |
Christina | Update | TCS | FROSTI Reconstruction | [Tyler, Ma, Christina, Luke]
We threaded the wiring of the
heater elements through the reflective surfaces |
|
|
601
|
Tue Jul 1 11:04:00 2025 |
Christina | Update | TCS | FROSTI Reconstruction II | [Ma, Tyler, Christina]
Finished
external reconstruction of the FROSTI by
installing all the pins to the 2 DB 25 connectors. |
|
|
604
|
Mon Jul 7 16:39:18 2025 |
Christina | Update | TCS | Pomona Box Drawings | Below are the drawings for the pomona
box modifications |
 |
|
608
|
Thu Jul 10 16:41:18 2025 |
Christina | Update | TCS | | [Christina, Ma, Tyler]
Pomona
Box completed and is now on the server rack
in 1119. Additionally, the photodetectors |
  |
|
611
|
Tue Jul 15 10:40:23 2025 |
Christina | Update | TCS | | [Christina, Ma, Tyler]
Yesterday,
Ma and I started taking data for the PSD/CSD
measurements while the photodetectors and |
|
|
614
|
Tue Jul 15 13:13:48 2025 |
Christina | Update | TCS | Photodetector optical post assembly | |
|
|
615
|
Tue Jul 22 12:20:29 2025 |
Christina | Update | TCS | | [Ma, Christina, Tyler]
Figure
1 shows the following PSDs for channels 0-15
from the 14 hour test. Figure 2 shows the |
 |
|
619
|
Tue Jul 29 12:30:00 2025 |
Christina | Update | TCS | 260 hour ADC update | [Ma, Christina, Tyler]
ADC CyMAC
260 hr, 8192Hz sampling rate channels V3
and Vref6 |
|
|
624
|
Mon Aug 11 22:19:50 2025 |
Christina | Update | TCS | Red Pitaya Data Streaming | [Ma, Tyler, Christina]
This past week, we were able to
set up the data streaming for continuous |
 |
|
629
|
Tue Aug 12 13:46:56 2025 |
Christina | Update | | | |
 |
|
631
|
Tue Aug 19 12:08:40 2025 |
Christina | Update | TCS | RP Initial vs CyMAC Plot Comparisons | [Tyler, Ma, Christina]
These are the
frequency averaged and veto binned plots
for the initial Red Pitaya and CyMAC systems. |
 |
|
173
|
Thu Jul 27 10:18:43 2023 |
Celeste | Update | TCS | Graphical Updates to HOM RH Modification | Attached are updated graphs of the irradiance
distribution from the 1/8th ring heater units
(extruded and reduced in length). |
|
|
180
|
Fri Jul 28 17:45:45 2023 |
Celeste | Update | TCS | Graphical Updates to HOM RH Modification, Friday 7/28 | Updated 1/8th Heater simulation modification
graphs. Slides 7, 10, 16-19 are new additions. |
|
|
187
|
Tue Aug 1 16:22:35 2023 |
Celeste | Update | TCS | Graphical Updates to HOM RH Modification, Tuesday 8/1 | Slides 20-33 are newly added (data/graphs
from parameter sweep feature-1/8th heater
unit length varied from 10% of original to |
|
|
200
|
Thu Aug 10 14:13:38 2023 |
Celeste | Update | TCS | 8/10/23, Simulation Graphical Progress | |
|
|
204
|
Fri Aug 11 10:57:20 2023 |
Celeste | Update | TCS | 8/11/23 Simulation Progress | |
|
|
209
|
Tue Aug 15 16:10:06 2023 |
Celeste | Update | TCS | 8/15/2023 Simulation Progress | |
|
|
586
|
Tue Jun 3 11:54:06 2025 |
Cece Ochoa | Update | | CE Cavity Design Update | Update on the design for the CE Cavity Mirrors |
|
|
659
|
Thu Nov 6 12:39:43 2025 |
Cece Ochoa | Update | ELOG | CE Cavity Design Update | Updated mode placements and ROC. No thermal
effects added yet. |
 |
|
6
|
Tue Jun 21 18:31:49 2022 |
Cassidy and Phoebe | Update | Cameras | IR Absorbing Screen and FLIR Camera Setup | Today we set up the IR absorbing screen and
the camera on the optical table, as well
as tested that the camera was functioning |
  |
|
9
|
Tue Jul 26 14:10:35 2022 |
Cassidy | Update | Cameras | Optical Post Replacement and Realignment | Today I replaced the 3" optical post that
the camera rests on with a 2" optical post
in order for the screen to correctly fill |
  |
|
81
|
Thu Apr 27 16:23:44 2023 |
Cao, Pamella and Julian | Physics | VAC | Installing vacuum system (cont.) |
[Pamella, Cao and Julian, Shane]
Particles account
10:37 am: Starting the particles account |
 |
|
11
|
Mon Oct 3 17:21:39 2022 |
Cao | Update | TCS | Inspection of macor parts | The macor parts arrived and inspected today.
These include:
Macor spacer
(drawing: LIGO_Redesign_Macor_Spacer_Drawing_v4.pdf |
7x |
|
67
|
Tue Apr 11 13:15:40 2023 |
Cao | Infrastructure | Clean & Bake | Nitrogen gas tank replaced | The nitrogen gas tank has been replaced with
a new unit. The new tank is ultra pure nitrogen
(>99.9% nitrogen).
The new tank has been |
|
|
70
|
Wed Apr 12 16:13:19 2023 |
Cao | Physics | VAC | Vacuum prep and installation | Aiden, Pamella, Peter, Shane, Cao
Today
we started vacuum chamber assembly work
10:16 am: Particle count measurement of clean |
|
|
84
|
Fri Apr 28 18:16:57 2023 |
Cao | Physics | VAC | Grounding vacuum system |
|
|
|
85
|
Fri Apr 28 19:00:13 2023 |
Cao | Physics | VAC | Tighten CF ports on vacuum chamber | [Cao]
After Jon's comment yesterday
that some of the connection did not seem
to have good metal-metal contact, in particular |
|
|
86
|
Fri Apr 28 19:39:19 2023 |
Cao | Summary | General | Clean and Bake Leybold TTR 91 Pirani Gauge |
|
|
|
98
|
Sun May 14 15:50:48 2023 |
Cao | Infrastructure | Computers | High resolution display of logrus machine | [Cao]
The display resolution of the
logrus has been 1064x768 and has been the
only option, which is not great. While remote |
|
|
130
|
Wed Jun 21 20:25:05 2023 |
Cao | Infrastructure | VAC | Vacuum chamber bake attempt 1 | TL;DR:
We are not yet able to
bake the chamber at 150 deg C due to some
current limit, most likely caused power supply |
6x |
|
141
|
Mon Jul 3 14:32:24 2023 |
Cao | Infrastructure | VAC | Cooling down vacuum chamber | [Cao]
After leaving the the chamber
to bake at 120 deg C from Thursday 3:41 pm.
Today I started to cool the chamber down |
|
|
142
|
Mon Jul 3 16:26:21 2023 |
Cao | Infrastructure | DAQ | Access and control Red Pitaya remotely and run it on local machine | [Cao]
To access and control the Red
Pitaya using Python locally on a machine
within the local network, one should follow |
|
|
97
|
Fri May 12 20:28:34 2023 |
Aiden, Cao | Physics | VAC | Vacuum chamber Helium leak test | [Aiden, Cao]
1. Helium leak test
2:00 pm: Uninstall regulator from nitrogen |
 |
|
145
|
Wed Jul 5 15:46:47 2023 |
Aiden, Cao | Infrastructure | VAC | Vacuum Chamber Baking Update |
Cao and Aiden put the RGA back on to
the chamber and measured the outgassing rate
after the chamber has cooled down from its |
|
|
17
|
Thu Jan 26 18:58:25 2023 |
Aiden | Update | General | Oven Heating | Aiden cleaned the oven with methanol again
and set the oven to 260 degC for 12 hours. |
|
|
23
|
Tue Feb 7 17:27:30 2023 |
Aiden | Physics | ELOG | Clean and Bake Batch #1 | Cleaned SS parts with liquinox for 20 min.
Then put in oven for 5 steps;
1. Ramp, 100
degC, 15 min
2. Const, 100 degC, 30 min
3. |
|
|
25
|
Fri Feb 10 15:15:30 2023 |
Aiden | Update | General | Bagging First Batch | Aiden Bagged and Tagged the first batch of
stainless steel parts shown on the google
spread sheet.
1. Removed two parts from |
|
|
29
|
Mon Feb 13 18:57:53 2023 |
Aiden | Summary | General | Clean and Bake batch 2 | Cleaned second batch of SS parts with liquinox
for 20 min. Then put in oven for 5 steps;
1. Ramp, 100 degC, 15 min 2. Const, 100 degC, |
|
|
30
|
Fri Feb 17 19:12:39 2023 |
Aiden | Update | General | Clean and Bake batch 3 | Bagged and Tagged batch 2 parts by placing
no more than two parts per ESD bag then taped
them with kapton tape and tagged them with |
 |