[Cece, Ma, Mary, Pooyan, Tyler, Paul]
We have continued the reorganization of our Physics 1125 and 1129 lab spaces. This includes:
- Moving two workbenches from Room 1129 into Room 1125
- The workbench with the oven is still in Room 1129
- Assembling the stainless steel table
- Moving the cleanroom frame toward the whiteboard side to make room for HVAC work
The sink in Room 1125 was painted, and we stood Frosti up. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|