Entry  Wed May 31 12:16:28 2023, Shane, Update, Cleanroom, cleanroom particle counts (full 5 zone measurement) 23.png
Attached is the full 5 zone particle measurement for the cleanroom after this week's cleaning, 5/31/23.
Entry  Wed May 31 11:42:16 2023, Pamella, Julian and Shane, Update, General, Cleaning room and particle count 
[Pamella, Shane and Julian]


 Cleaning room and particle count 

  09:58 am: Started the particle count 
Zone
3:  
     0.3u : 1,995 
     0.5u : 540 
     1.0u : 0 


    Zone 4:  
     0.3u : 124 
  
  0.5u : 0 
     1.0u : 0 




 10:25 am: Started checking the surfaces inside the cleanroom. 
 10:30
Entry  Tue May 30 14:51:27 2023, Pamella, Update, FLIR, New 3D mask - Bigger triangles shapes. AcquisitionImage(May-30-2023_14_38).jpgthumbnail_IMG-7303.jpg
[Pamella]

 Change the 3D mask 
 Started removing the old mask in the reflector.
 Started cutting the new aluminum lid for the
new 3D mask and assembling in the 3D mask.  
 Started doing the new cable connections for the light. 
 Started testing the resistance
in the new cable connections. The multimeter show us 14.2 Ω. 
 Started attaching the mask with the light and the thermometer sensor. 
Entry  Wed May 24 14:28:26 2023, Peter, Update, VLC Electronics, Laser intensity/polarization drift measurements Time_Series_Trial_7_16hrs.pngPower_vs_Time_16hrs.pngPolar_angle_vs_time_16hrs.pngRel_Intens_vs_time_16hrs.png
I went in and took polarization drift data for 16 hours. The run started at 6:08pm and finished at 9:15am the next day. The four plots below are the same
plots shown for the 2 hour collection and previous trials, except they extend to 16 hours. The only one that is different is the Power vs. Time graph.
This is a graph of the actual incoming power of the laser (as opposed to the signal voltage that the PDA's output into the red pitaya). This was done using
Entry  Wed May 24 14:06:27 2023, Pamella, Update, FLIR, FLIR project - Tests AcquisitionImage(May-24-2023_10_50).jpgthumbnail_IMG-7146.jpgAcquisitionImage(May-24-2023_14_30).jpg
[Pamella]


 Initial tests 
 10:30 am : Started trying take some test with the new position/configuration between the 3D reflector-mask
and the FLIR camera. 
 10:41 am : Started running the python code and take a snap. Parameters: 0.10 A, 1.4 V.
 10:50 am : Started take
the snap.It is possible see the triangles, this is a good thing. Negative thing: The middle/center point for the light maybe would be some problems for
Entry  Tue May 23 16:52:56 2023, Pamella, Update, FLIR, FLIR project - Reinstalling the mask and Reconfiguration FLIR position. AcquisitionImage(May-23-2023_16_36).jpgReconfiguration.jpg
[Pamella]


 Reinstalling the mask and Reconfiguration FLIR position.
 Today i change the aluminum foil inside the 3D mask. After some
 tries i was able to have a better shape for the triangles. 
 I reinstalled the connections (the light with the thermometer point). Also i checked
for the focal point inside the reflector, looks fine. 
 I did a reconfiguration for the initial tests, without the black wall. I moved the FLIR
Entry  Mon May 22 17:08:50 2023, Pamella, Update, FLIR, FLIR project - Installing the mask. Mask.jpgAcquisitionImage(May-22-2023_16_35).jpgAcquisitionImage(May-22-2023_16_01).jpg
[Pamella]



 The new mask for the reflector.  


 1:40 pm: Started reconfiguration on the FLIR camera project. Changed the
old bridge for the new mask-bridge. 
 2:00 pm: Started figure out the best way to cutting the aluminum foil with the new mask. Unfortunately,
I had been some problems for cutting the perfect shape triangles with the mask because the size inside the triangle is different (smaller) than  cutter/knife,
Entry  Mon May 22 16:43:28 2023, Peter, Update, VLC Electronics, Laser intensity/polarization drift measurements S-P_Polarization_Diagram.svgPolar_angle_vs_time.pngRel_Intens_vs_time.png
In order to fully analyze the polarization data taken last Thursday, I needed to convert the signal output (which is in volts) to power (units of watts).
I used the power meter to accomplish this. Keeping the exact same configuration of PD's and beam splitting, opened the red pitaya's oscilloscope package.
I then took the power meter, and held it in front of the PD to measure the amount of Watts at each PD. I then wrote down the corresponding voltage being
Entry  Thu May 18 14:07:08 2023, Peter, Update, VLC Update, 532nm Intensity Measurement Time_Series_Trial_4.pngTime_Series_Trial_5_2hrs.png
I figured out a method in which to capture power measurements including the initial seconds in which the beam is first turned on. I first clear and restart
the kernel of the python notebook. Then I run the command to connect the red pitaya oscilloscope package to the input data being taken in both channels.
To my understanding, this allows for data acquisition as the code compiles. I then started looping the 1.074s trigger bunches, and then roughly 2 seconds
Entry  Wed May 17 12:18:08 2023, Pamella, Julian and Shane , Update, General, Cleaning room and particle count 
[Pamella, Julian and Shane]



Particle count: 
  10 am: Started particle count 

 Zone 3 :

 0.3u: 1288  

0.5u: 332 
 1.0u: 124 


 Zone 4 :

 0.3u: 498 
 0.5u: 166 
 1.0u: 83 




10:40 am: Checked the surfaces inside the cleanroom. 
 10:50 am: Started vacuuming the cleanroom. 
 11:15 am: Started mopping the cleanroom.
Entry  Tue May 16 11:56:33 2023, Peter, Update, VLC Electronics, 532nm Intensity Measurement Time_Series_Trial_3.png
With the configuration the exact same as before, I used the Jupyter notebook in the red pitaya's development package to collect data from both input channels.
Last week, I was able to take data, yet only for a very short period of time, and I did not know how to change it. I went online to the red pitaya's user
manual to figure out how to change the sampling period for longer. The link to the page is here:    https://redpitaya.readthedocs.io/en/latest/appsFeatures/examples/acqRF-samp-and-dec.html#s-rate-and-dec
Entry  Sun May 14 15:50:48 2023, Cao, Infrastructure, Computers, High resolution display of logrus machine 
[Cao]

 
The display resolution of the logrus has been 1064x768 and has been the only option, which is not great. While remote access to logrus using
rdesktop allows rendering a virtual display of user's chosen resolution, it is not fast when using graphic-intensive program. NoMachine allows user to
take over and control the machine remotely and thus appears as the same machine. However, NoMachine cannot render a virtual display like rdesktop. This
Entry  Fri May 12 20:28:34 2023, Aiden, Cao, Physics, VAC, Vacuum chamber Helium leak test PXL_20230512_211717602.jpgArLeak_230512.png
 [Aiden, Cao] 

 
 1. Helium leak test 

 2:00 pm: Uninstall regulator from nitrogen gas tank and move to helium gas tank. Place helium onto
cart and move to the rear door of the clean tent. With the tank remaining outside, feed hose through the flexible wall to use in clean tent -  See attached
Entry  Wed May 10 10:49:34 2023, Aiden, Update, General, RGA Software 
[Aiden, Cao]

Went over how to use the RGA software, how to change the graph units, scaling and mass detection. Also went over how to remove the RGA from
the vacuum system as well as procedure for turning it on.
Entry  Tue May 9 20:55:12 2023, Jon, Infrastructure, VAC, Calibrated Ar leak rate VTI-Calibrated-Ar-Leak.jpeg
For future reference, the calibrated Argon source has a leak rate of 7.55E-8 atm cc/s, or equivalently 5.74E-8
torr L/s. This can be used to calibrate RGA scans to units of physical leakage (outgassing) rate.
Entry  Wed May 3 19:03:47 2023, Julian,Pamella and Cao, Physics, VAC, Modify vacuum asssembly and install RGA vaccum_chamber_re-configuration.jpg
[Pamella, Julian, Cao]

   Today we started re-configuring the vacuum chamber components. 

 Particle count 

 10:45 am : Starting
the particle count in the clean room. 
 11:13 am : Finished the particle count in the clean room. 




  Zone 3 :


 0.3 u: 2535 
 0.5 u: 1413 
 1.0 u: 789 


  Zone 4 :
  0.3 u: 457  
      0.5
    Reply  Tue May 9 15:49:20 2023, Jon, Infrastructure, VAC, Permanent cable routing 
Today I brought in a fresh supply of zip ties (we now have 1500 in the tool chest) and used them to permanentize the cable routing for the gauges, pumps,
and RGA.
I also brought and installed a 3-foot 15A extension cable for powering the scroll pump. Installing the cable required shutting down the pumps,
Entry  Mon May 8 12:00:03 2023, Pamella, Shane, Julian, Update, General, Cleanroom particle counts and cleaning the cleanroom. 
[Pamella,Julian, Shane]


Today we cleaned the clean-room (floor, surfaces) and particle count.



10:00 am: Started particle count.


 Zone 3:  
 0.3u: 1330 
 0.5u: 540 
 1.0u: 415 

 Zone 4: 
 0.3u: 290 
 0.5u:
83 
 1.0u: 0 





Clean-room:
 10:30 am: Started wiping down the surfaces inside the clean-room 
 10:41 am:
Entry  Thu May 4 14:01:10 2023, Peter, Update, VLC Electronics, 532nm Intensity Measurement graphs(3).jpggraphs(2).jpg
I adjusted the rotational mount of the wave plate to see if the power can be 100% coupled into either S or P polarization. The images shown below of the
oscilloscope indicate that this is not possible. The minimum transmitted power we can obtain in either S or P polarization is 75mV. The maximum voltage
we obtain in either S or P polarization is ~ 740mV. This means that at a maximum, we can obtain ~ 90% polarization in either direction, indicating that
Entry  Tue May 2 17:03:14 2023, Jon, Cao, Physics, VAC, First pump-down test of vacuum chamber PXL_20230502_203343616.jpgPXL_20230502_210234897.MP.jpg
 [Jon, Cao] 

  1. Re-routing of cables  
  
We re-routed the connections between the turbo pump and its fan to the controller. Instead of going through the side of the server rack, they
Entry  Tue May 2 15:55:33 2023, Peter, Update, VLC Electronics, 532nm Intensity Measurement IMG-0221.jpgIMG-0222.jpggraphs(1).jpgTime_Series_Trial_2.png
I changed the 1/2 wave plate from the lens mount to the rotational optic mount. This allowed me to rotate the 1/2 wave plate, which changed the respective
polarization power transmitting through S and P polarization. Initially, more power was coupled into the P polarization. Now, with the 1/2 plate rotated,
both channels are experiencing the same voltage reading. Before feeding the PDA signals into the red pitaya, a 50 ohm terminator had to be placed at the
Entry  Mon May 1 18:56:57 2023, Peter, Update, VLC Electronics, 532nm Intensity Measurement graphs.jpgTime_Series_Trial_1.png
I've configured the two PDA's to the Red Pitaya. I put a 50 ohm resistor connector to each red pitaya input port. This was because the oscilloscope showed
that the voltage reading from the P polarization PDA was almost at 1V, which was the limit of the red pitaya. Once both S and P polarization PDA's were
connected, I opened the red pitaya's oscilloscope. A screenshot of the voltage readings is shared below. Channel 1 (Yellow) is for S polarization. Channel
Entry  Mon May 1 17:10:25 2023, Julian, Cao, Physics, VAC, Installing Pirani gauge and RGA probe onto to vacuum chamber PXL_20230501_225241491.jpgPXL_20230501_235854958.jpgPXL_20230501_234750795.MP.jpg
 [Julian, Cao] 



 03:00 pm: Particle count

:  Zone 3 

 0.3 um: 498
 0.5 um: 124
 1 um: 124


:
 Zone 4 

 0.3 um: 748
 0.5 um: 457
 1 um: 374





 03:32 pm: Installing Pirani
Entry  Thu Apr 27 09:48:34 2023, Aiden, Summary, General, Batch 12 Bagging IMG_4279.jpgIMG_4278.jpg
I took batch 12 out of the oven and put them in a bag and placed the bag inside the clean room in the first large stainless steel container.

I also looked
at the small gauge that we felt like needed to be baked and I can confirm that without further cleaning around the inside of the gauge it should not be
connected to the main vacuum. I have attached a photo of the inside of the gauge.
    Reply  Fri Apr 28 19:39:19 2023, Cao, Summary, General, Clean and Bake Leybold TTR 91 Pirani Gauge 




Quote:

I took batch 12 out of the oven and put
them in a bag and placed the bag inside the clean room in the first large stainless steel container.

I also looked at the small gauge that we felt like
Entry  Fri Apr 28 19:00:13 2023, Cao, Physics, VAC, Tighten CF ports on vacuum chamber TightenCF.png
[Cao]

 
After Jon's comment yesterday that some of the connection did not seem to have good metal-metal contact, in particular the gate valve connection,
I went through the ConFlat connections today and retighten them.
I found a lot of the CF connections are not particularly tightened and there were a lot
of range left that can be tightened with the  wrench. After re-tightening, the copper gaskets are not visible anymore. For example, see the attached images
Entry  Thu Apr 27 16:23:44 2023, Cao, Pamella and Julian, Physics, VAC, Installing vacuum system (cont.) IMG_0139.pngIMG_0136.png

 
[Pamella, Cao and Julian, Shane] 


 Particles account 
 10:37 am: Starting the particles account 

 
Zone 3:

 0.3u: 1662 
 0.5u: 872 
 1.0u: 415 


  Zone 4:

 0.3u: 831 

0.5u: 124 
 1.0u: 0 



 11:14 am: Start removal of calibrated leak to install 45 deg elbow 
 11:21 am:
    Reply  Thu Apr 27 21:43:07 2023, Jon, Physics, VAC, Grounding vacuum system IMG_0141.pngIMG_0140.png
This afternoon I made up a green 10 AWG grounding cable and connected it to the vacuum system.
One end is tightly connected to the bottom flange of the vacuum chamber (photo 1). It is run along and up the table framing to the top of the cleanroom,
where it exits into the overhead cable tray in the same location as the other power cables. It drops down from the top of the server rack all the way to
       Reply  Fri Apr 28 18:16:57 2023, Cao, Physics, VAC, Grounding vacuum system 




Quote:

This afternoon I made up a green 10
AWG grounding cable and connected it to the vacuum system.
Entry  Fri Apr 28 11:21:01 2023, Peter, Update, VLC Update, Laser intensity/polarization drift measurements IMG-0183.jpg
The Digi-key cables have arrived, and I have began implementing them in the intensity drift measurements. 

There was a slight problem initially in connecting
the SMA to BNC cables from the photodiode to the red pitaya, since the red pitaya was way on the other side of the lab. Cao and I connected the red pitaya
to a new ethernet cable that extended far enough for the red pitaya to sit comfortably on the breadboard with the optics. 

Right now the PDAs are not
Entry  Wed Apr 26 18:05:41 2023, Pamella, Julian, Shane, Update, Cleanroom, cleanroom particle counts and cleaning log counts4_26_23.png


 pre-cleaning particle counts: 
  zone 3 
 
 0.3 mu: 2494

 0.5 mu: 748

 1.0 mu 124




 zone 4 

 0.3 mu: 374

 0.5 mu: 41

 1.0 mu: 0







 3:45 pm: Started wiping
the surfaces(laser table,chamber, computer) inside the cleaning room. 
 4:05 pm: Finished wiped the surfaces 
 4:08 pm: Began vacuuming
Entry  Tue Apr 25 11:56:37 2023, Jon, Update, VLC Electronics, Red Pataya has arrived Red_Pataya.jpg
The Red Pataya 125-14 starter kit that we ordered for locking the 532 nm cavity has arrived. I left it laying on the optical table near the laser.
Entry  Mon Apr 24 17:38:45 2023, Aiden, Summary, General, Clean and Bake Batch 12 IMG_4269.jpgIMG_4268.jpg
Today I Bagged and tagged the o-rings from batch 11 and placed them inside the clean room. I also cleaned batch 12 parts in liquinox for 10 minutes and
them placed them into the oven where they will undergo the following steps;

1. Ramp to 100 degC in 15 min.
2. Dwell at 100 degC for 30 min.
3. Ramp
to 200 deg C in 30 min.
4. Dwell at 200 deg C for 48 hours.
5. Off
Entry  Fri Apr 21 16:51:26 2023, Pamella, Update, General, Cleaning cables. IMG_5416.jpeg
Cables for the vacuum system.
 
 Today i wiped, bagged and tagged two cables for the vacuum system. I used IPA wipes for cleaning this two split
power cord. I attached a image below.  
Entry  Fri Apr 21 15:21:18 2023, Pamella, Update, FLIR,  AcquisitionImage(Apr-21-2023_14_26).jpg
     FLIR project updates

    
 01:50 pm: Starting test position 34 mm distance to black wall. 
  Parameters : 0.100 A, 1.5 V and
the temperature inside the mirrors 40°C. 
 2:09 pm : Finished the test and figured out this position it is too far the black wall so now we change
for more close position. 




   2:17 pm:  Starting test in another position: 10 mm distance to the black wall( this measurement
Entry  Wed Apr 12 16:13:19 2023, Cao, Physics, VAC, Vacuum prep and installation VacAssy230412.png
Aiden, Pamella, Peter, Shane, Cao 


Today we started vacuum chamber assembly work

 10:16 am: Particle count measurement of clean
room 
 10:34 am: Particle counting finished: meets ISO 5 standard

  Zone 3 : 

 0.3 u: 3159
 0.5 u: 789


1.0 u: 83

  Zone 4 :


 0.3 u: 498
 0.5 u: 41
 1.0 u: 0









    Reply  Fri Apr 21 00:06:43 2023, Jon, Update, VAC, Vacuum prep and installation - parts have arrived SS_parts.png
The two parts needed to complete the vacuum assembly (ELOG 70) have arrived.

(10) 5/16"-24 x 1 3/4" threaded rods - for attaching the turbo pump reducing nipple to the CF 4.5" gate valve;
(1) 45 degree CF
2.75" elbow for attaching the calibrated Ar/He leak to the chamber.

I left them laying on top of the ultrasonic washer. They both need
Entry  Wed Apr 19 17:39:50 2023, Pamella, Update, FLIR, FLIR project AcquisitionImage(Apr-19-2023_10_23)(1).jpgAcquisitionImage(Apr-19-2023_10_57)_(1).jpgAcquisitionImage(Apr-19-2023_11_18)_(2).jpg


  FLIR project updates- Initial tests 



 10:00: Starting test in position 2 cm to the black wall.
 Parameters : 0,305
A, 05,5 V and the temperature inside the mirrors 141,8°C.
 10:23 Finished this first tried and take snap. The image is attached below. 

The name for the picture for this tried is “AcquisitionImage(Apr-19-2023_10 23)”. 





 10:37. Starting test in another position
Entry  Mon Apr 17 17:06:49 2023, Aiden, Summary, General, Clean and Bake batch 11 IMG_4262.jpg
Cleaned the Viton O-Ring for the main chamber in Liquinox for 10 minutes. Then put it in the oven to back for;

1. Ramp to 100 degC in 15 min.
2. Dwell
at 100 degC for 30 min.
3. Ramp to 180 degC in 30 min.
4. Dwell at 180 degC for 24 hours.
5. Off

Note: There were three viton -rings in the bag sent
to us. I cleaned and baked 2 of them and left the third in the bag.
Entry  Wed Apr 12 16:17:50 2023, shane, Update, General, Particle Counter moved IMG_6693.HEIC
With the added height of the new docking station, the particle counter no longer fits under the Windows monitor in the electronics rack and has been moved
to the desk in the corner of the lab.
Entry  Wed Apr 12 10:53:02 2023, Aiden, Summary, General, Valve Cleaning 
Bagged and Tagged the parts from batch 10 and placed them inside the clean room. 

Then cleaned the last gate valve in liquinox for 20 minutes (10 minutes
each side). Then dried the valve, bagged, tagged, and placed it inside the clean room.
Entry  Tue Apr 11 17:56:15 2023, Pamella, Update, General, Lab cleaning  
Today Pamella and Julian finished cleaning of the cleanroom, starting with the HEPA vacuuming, mopping and clearing all floor with IPA wipes. Also we wiped
down some surfaces of the blue table, computer table and the top of chamber.
Entry  Tue Apr 11 13:15:40 2023, Cao, Infrastructure, Clean & Bake, Nitrogen gas tank replaced 
The nitrogen gas tank has been replaced with a new unit. The new tank is ultra pure nitrogen (>99.9% nitrogen).

The new tank has been placed and secured
to the rack where the old one is; cap is removed and regulator is reinstalled onto the new tank. 
Entry  Fri Apr 7 09:48:09 2023, Pamella, Update, General, Clean the system parts 7x
Pamella and Julian wiped and tag system parts for the vacuum machine. We used isopropyl and vectra wipes in the most import pieces: 
Inverted magnetron
pirani gauge and the air cooling kit 81. The other parts we uses the IPA wipe for cleaning.
So for now we finished with ever system parts which was in
the gabinetes.
I put photos below.  The photos is for all part we cleaning, tag and which puted inside the cleaning room.
Entry  Thu Apr 6 10:20:43 2023, Peter, Update, VLC Update, Laser intensity/polarization drift measurements Optical_Setup_4-6-23.jpg
More optical components were added to the optical set up for laser intensity / polarization drift measurements. Both lenses and both PDs were added to the
configuration, as seen in the image below. The beam is already well aligned into the center of both of PDs, and focused nicely by the lens. 

Both PD's
take BNC connecting cables, and the Red Pitaya takes SMA connecting cables. Since we are currently without a BNC to SMA cable, and we do not want to cut,
Entry  Tue Apr 4 16:52:08 2023, Jon, Update, Cleanroom, Particle counter docking station Met_One_Dock.png
Due to the problems we have encountered trying to serially communicate directly with the Met One DR-528 particle counter, I went ahead and ordered the add-on
communications/charging dock. The dock "ethernetizes" the serial communications by wrapping them in TCP packets and transmitting them over the lab network.
This will allow our Python code to communicate using the standard Internet sockets package, rather than PySerial, PyNut, etc.

the docking station arrived
Entry  Tue Apr 4 16:43:53 2023, Jon, Update, VLC Electronics, Additional Thorlabs PDA10A2 PDA10A2.png
I ordered a second PDA10A2 and mounting post + spacer (which puts the aperture at the VLC's standard 3" beam height). These arrived today and I delivered
them to the lab. They are sitting on the VLC table near the laser.
Entry  Tue Apr 4 09:53:37 2023, Peter, Update, VLC Update, Laser intensity/polarization drift measurements initial_Intens_measure_set_up.jpg
The set up for the next round of beam characterization measurements has begun. The beam is initially passing through a half waveplate, is split at a polarizing
beam splitter, and then stirring mirrors are used to properly aim the beam into photodiodes (not yet installed). This is the current configuration of the
set up. 
Entry  Tue Apr 4 09:39:58 2023, Peter, Update, VLC Electronics, 532 M2 Measurements OmegaY_M2_Fit_8.pdfOmegaX_M2_Fit_8.pdfM2_Measurements_Set_Up.svgBeam_Data_8_3lens.txt
Final M squared measurements were taken Wednesday, 3/29/23 by Peter and Ryan Hinosawa. 5 separate sets of data were taken, and upon discussion, we declared
the plots shown below in attachment 1 and 2 as the final plots of our M squared measurements.

The optical design of the M squared measurement process
is given in attachment 3. The laser and three lenses shown below are mounted on the optical table. The track is placed behind the third lens, and the camera
Entry  Mon Apr 3 17:04:05 2023, Aiden, Summary, General, IDP Scroll Pump Assembly IMG_4244.jpg
Aiden installed the isolation valve and the exhaust silencer kits on the IDP-3 Scroll pump. The entire assembly still needs to be wiped down but overall
no residue came off when putting on the kits.
Entry  Fri Mar 31 14:23:13 2023, Pamella, Update, General, Clean and bake batch 11 4AC705B8-D906-47E3-86E4-49E4967910E7.jpeg
Today I bagged and tagged batch 11. I wiped the some tools: Centering ring alum( 2 pieces), reversible ratcheting, gasket removal (CF). After wiped that
I bagged and tagged this parts and put inside the cleanroom. 
Also I wiped one power cable (3 meters), bagged and tagged that and inside the cleanroom.

I put photo below.
Entry  Wed Mar 29 16:00:36 2023, Pamella, Update, Cameras, FLIR project  15D13FE3-48A9-4ACF-9422-07032DD8D028.jpeg

Today Pamella and Tyler started  work in the updates for the FLIR project. 
We trie for the first time cover the mirrors with aluminum foil and run the
code with this. 
We work in figured out how the python codes works with real datas. 

To do:
Understand how get the real datas and how to compere that
with the old datas.
Starting test with the FLIR and mirrors with aluminum foil in with the power on.
Testing the FLIR camera  more times with the mirrors
Entry  Fri Mar 24 13:36:17 2023, Pamella, Update, General, Clean and Bake batch 10 260AEB73-02D0-4635-93B3-B2EB3269FB84.jpeg59FD199A-A444-439A-8D51-C242B65BBECD.jpeg9A48A0EE-5EFE-409D-ACC0-17011F6F7EBF.jpeg950F85B7-D304-4724-AB3D-B606E422F1E3.jpeg
Today I bagged and tagged batch 10.
 I wiped the RGA vacuum component for around 25 minutes after that I bagged and tagged this part and put inside the
cleanroom. The RGA vacuum component have a big size and because off that i used the big bag.
I wiped one power cable (2 meters), bagged and tagged that
and inside the cleanroom.
For the parts in the oven, a bunch of screws, I bagged and tagged the screws and put inside the cleanroom.
I put photos below
Entry  Wed Mar 1 21:50:46 2023, Jon, Infrastructure, Computers, Workstation 2 (ws2) mounted on cleanroom cart ws2_cart-1.jpegws2_cart-2.jpeg
The Linux workstation (ws2) that used to sit on the blue workbench (now inside the cleanroom) has been mounted on a mobile cart, as pictured below. This
is intended to be a clean cart that will be housed inside the cleanroom.

The cart is currently dirty and will need to be throughly wiped down (along with the computer monitor and peripherals) prior to being moved into
    Reply  Fri Mar 24 07:14:38 2023, Jon, Infrastructure, Computers, Workstation 2 (ws2) mounted on cleanroom cart 
The ws2 cart has been thoroughly wiped down with IPA wipes and moved inside the cleanroom. I have reconnected it to power and Ethernet (cables bundled and
ran to the server rack just outside the cleanroom). It is ready for use.





Quote:

Entry  Thu Mar 23 18:40:08 2023, Julian, Update, General, Cleanroom Update 
Today Pamella and I came in to Hepa vacuum and mop the floor of the cleanroom for general maintenance. 