Entry  Mon Jul 15 13:30:49 2024, Luke , Update, VAC, Problem with 2.75" to 1.33" zero length reducer  IMG_1882.jpg
Last Friday while checking the depth of the ZLR I got one of the screws stuck. Today I tried a couple things to get it out. First I tried a few different
pliers to be able to grip lower on the screw this didn't work. So I switched to the other method of drilling a small hole to see if maybe the threads would
pull away from the walls of the hole a bit. This kind of worked as seen in the picture below I was able to remove most of the screw but there is a bit
Entry  Mon Mar 10 17:03:52 2025, Shane, Update, CDS, Pressure Gauge successful connect 
Vac system serial interfacing update: the pressure gauge is now able to communicate successfully through the code. It's been set to a static ip of 192.168.1.30,
on port 8000.  
Entry  Mon Nov 6 11:29:24 2023, Tyler, Update, Electronics, Preliminary RTD Calculations, RP Software Update cvt.pngVvC.pngIMG_7471.jpg

Preliminary RTD calculations are shown below, given an input of 10 V and desiring a few mA of current. It looks like R_ref should be at least 1 kOhm
(refer to plots/circuit below), keeping in mind we need to have 


RP: The Red Pitaya Software was updated to OS 2.00. All examples on the RP website should run without issue.
Entry  Tue Aug 1 12:48:41 2023, Aiden, Update, Cleanroom, Pre Filter Change IMG_4564.jpgIMG_4563.jpgIMG_4562.jpg

Changed the pre filter inside of the 3 stage HEPA system next to the soldering station. It was rather dirty and I have attached images with a clean
filter on the left and the used one on the right. I reset the pre filter age on the system. I tried to see if I could tell if the HEPA filter was dirty
but I could not see it. I did not reset the age of the HEPA or UV stations. They are currently 378 days old.
Entry  Wed Jun 28 15:58:56 2023, Shane, Cao, Infrastructure, VAC, Power trip problem remains, source of smoke is insulation Pumpline_afterRemoveInsul.jpgRGAline_afterRemoeInsul.jpgMeltedInsulation1.jpgMeltedInsulation1.jpgMeltedInsulation2.jpg
[Shane, Cao] 


With the new change in wiring configuration described in elog 136, we tried
to power up the heaters for baking the vacuum chamber again.



Given that we were worried about the turbo pump overheats, we set the setpoints of of bother high temperature  controller and PID controller to
    Reply  Tue Feb 20 08:01:30 2024, Jon, Infrastructure, General, Power and network equipment installed in 1129 rack IMG_0924.jpegIMG_0925.jpegIMG_0921.jpegIMG_0922.jpeg
[Jon, Tyler, Pooyan, Luis, Luke, Peter]
On Thursday we installed the power conditioning/distribution equipment and networking equipment in the new 1129
rack. The hardware is identical to the setup in the 1119 rack and includes:

Tripp Lite SU5KRT3UTF - 208V, 5kVA on-line UPS with 120V transformer
CyberPower PDU20M2F12R - metered power distribution unit,
    Reply  Tue Jul 18 16:35:06 2023, Pamella, Update, FLIR, Plot-Data with the new configuration without the mask and reflector. Gauss.plot.jpeg
[Pamella]

I was able to plot the first graph for a result between the six different positions on the screen, for now we can see the behavior
of the heater temperature in a Gaussian graph with combination data between the six files. 
To do: Tyler gave me some ideas today to improve
the plot. So I'm going to change the code to have insulation on the values for just the heater ("insulation") and I'm going to plot after this insulation
Entry  Thu Aug 29 16:39:34 2024, Luke, Update, VAC, Photos of heater tape 6x
 
    Reply  Tue May 9 15:49:20 2023, Jon, Infrastructure, VAC, Permanent cable routing 
Today I brought in a fresh supply of zip ties (we now have 1500 in the tool chest) and used them to permanentize the cable routing for the gauges, pumps,
and RGA.
I also brought and installed a 3-foot 15A extension cable for powering the scroll pump. Installing the cable required shutting down the pumps,
Entry  Mon Nov 28 18:10:23 2022, shane, Update, ELOG, Particle counts in the clean room clean_room_particle_counts_11_28_-_Sheet1.pdf
Particle count stats for the clean room Nov 28, 2022: 
Took 10 sample runs in each of 5 regions in the clean room (5 runs per region with a person inside
the clean room for the measurement, and 5 runs per region without anyone in the clean room for the measurement), for a total of 50 samples taken. Sample
time was 60 seconds. Overall clean room average particle count for the size ranges are as follows:
0.3 micrometers- 3405.76 (room occupied), 974.92 (room
Entry  Tue Apr 4 16:52:08 2023, Jon, Update, Cleanroom, Particle counter docking station Met_One_Dock.png
Due to the problems we have encountered trying to serially communicate directly with the Met One DR-528 particle counter, I went ahead and ordered the add-on
communications/charging dock. The dock "ethernetizes" the serial communications by wrapping them in TCP packets and transmitting them over the lab network.
This will allow our Python code to communicate using the standard Internet sockets package, rather than PySerial, PyNut, etc.

the docking station arrived
Entry  Wed Apr 12 16:17:50 2023, shane, Update, General, Particle Counter moved IMG_6693.HEIC
With the added height of the new docking station, the particle counter no longer fits under the Windows monitor in the electronics rack and has been moved
to the desk in the corner of the lab.
Entry  Mon Oct 9 11:29:37 2023, Tyler, Update, Electronics, PSD/CSD Plot Updates Screenshot_2023-10-09_at_11.20.25_AM.pngwelch_csd-2.png
Continuing from Sophia's SURF Project this summer: Plotting the Power-Spectral Densities (PSDs) and Cross-Spectral Densities of two signals.

A continued
issue that has been observed in the plots is the random "jump" of one PSD curves. Below, a 1.4 kHz signal is driven with a magnitude of 0.7 Vpp, and connected
to the two output ports of the Red Pitaya via an SMC T-Adapter. At the moment, I anticipate that this bug might have something to do with the Real-Time
Entry  Mon Mar 10 21:13:12 2025, Nathan, Update, VLC Update, PDH Lock Progress and Next Steps thumbnail_(2).jfifthumbnail_(4).jfifthumbnail_(5).jfifVisible_Light_Optical_Cavity_(2).pdf
Progress update: Photodiode is set up, need to set up DC bias tee, EOM has 400-600nm wavelength range with a resonance frequency of 0.1-100MHz. Additionally
need to connect the DC bias to SR560, put it in low pass, then connect to the function generator and connect it to oscilloscope to observe. Once everything
looks good and working, need to connect the driver and we can start actuating on the cavity ETM.
Entry  Wed Mar 1 21:27:20 2023, Jon, Infrastructure, Cleanroom, Over-table shelf height raised cleanroom-shelf.jpg
Jon, Cao

Today we raised the height of the shelf overhanging the cleanroom laser table by 8 inches. This was done to create more vertical clearance between
the top-loading vacuum chamber and the bottom of the shelf. The added clearance should make both removing the chamber lid and inserting large parts easier.
Entry  Mon Jan 23 17:26:15 2023, Peter Carney, Update, General, Oven cleaning 
Aiden and Cao 
Turned on the oven to 120 deg C for 12 hours. After 12 hours, put it at 200 deg C for 48 hours. 
Entry  Thu Jan 26 18:58:25 2023, Aiden, Update, General, Oven Heating 
Aiden cleaned the oven with methanol again and set the oven to 260 degC for 12 hours.
Entry  Fri Feb 23 18:03:27 2024, Tyler, Update, FLIR, Optical Test Setup in Cleanroom IMG_0941.png
[Tyler, Xuesi]

The FLIR and test mass stand-in have been transferred into the cleanroom. A software test will be run as soon as we get an ethernet
cable long enough to reach into the cleanroom where the camera is set up. Once this is finished, the FLIR will be moved aside for construction of the FROSTI!
When completed, the camera will be placed back into position for in-air optical testing.
Entry  Tue Jul 26 14:10:35 2022, Cassidy, Update, Cameras, Optical Post Replacement and Realignment YAxisAlignment.pngXRotZAlignment.pngNewOpticalPost.png
Today I replaced the 3" optical post that the camera rests on with a 2" optical post in order for the screen to correctly fill out the camera's FOV. The
3" post is now in the glass optics cabinet next to the FLIR camera configuration box, wrapped in the protective materials from the 2" post for safekeeping.


There were no issues with the physical replacement of the post, except that the fork clamp on the post needs to be on one of the perpendicular,
Entry  Thu Feb 27 18:22:21 2025, Shane, Update, CDS, Ongoing work in server rack and desk area (1119) 
As part of the vacuum communications debugging process, there is ongoing work in the server rack and desk area in 1119. Please be careful not to move any
of the materials left out in the server rack or on the work bench. 
Entry  Mon Aug 12 17:09:04 2024, Cynthia , Update, Interferometer Simulations, O4 vs O5 cavity scans with ITM plume guess or ETM O5_plots_and_tables.pdfO4_plots_and_tables.pdfETM12mapO5.pngScreenshot_2024-08-12_at_5.05.31_PM.png
So far the proposed solution for what to use for O5 ITM mirror for SIS simulations is either the plume guess file or using the O5 ETM mirror for ITM. I
had ran a cavity scan for both of these possibilities and it seems like the results produced are fairly different. The next step is most likely moving
on to adding the Frosti effects including both of the proposed possibilities, and before this, a few confirmations and verifications are needed using similar
Entry  Mon Jul 1 15:19:42 2024, Cynthia , Update, Interferometer Simulations, O4 and O5 mirror cavity scans with thermal effect cavityScan_07_01.pdf
 
Entry  Tue Apr 11 13:15:40 2023, Cao, Infrastructure, Clean & Bake, Nitrogen gas tank replaced 
The nitrogen gas tank has been replaced with a new unit. The new tank is ultra pure nitrogen (>99.9% nitrogen).

The new tank has been placed and secured
to the rack where the old one is; cap is removed and regulator is reinstalled onto the new tank. 
Entry  Fri Feb 10 16:34:45 2023, Huy Tuong Cao, Infrastructure, Clean & Bake, Nitrogen gas tank ready to use AirGunSealed.jpg
Cao,


Today I fixed the final bit related to the nitrogen gas tank, which is to apply sealing tape to M-NPT connector of the hose to prevent 
leakage
(file: AirGunSealed.jpg) 

After application of the tape, no audible leak can be heard from connection between the hose and the air gun. 
Entry  Fri Jul 26 17:25:42 2024, Jon, Infrastructure, Computers, New workstation ws4 installed in 1129 ws4.jpg
Today I installed the second desktop workstation in 1129. The new machine is an Intel NUC13ANHi5, with a 12-Core Intel i5-1340P CPU, 32GB DDR4 RAM, and
a 1TB SSD.
I loaded it with a fresh installation of Debian 12 and installed the LIGO CDS workstation (control room) tools. It is assigned the hostname ws4
Entry  Thu Jun 20 18:01:11 2024, Jon, Infrastructure, Computers, New workstation ws3 in 1129 
I have repurposed a spare Intel NUC to serve as the first of two planned workstations in 1129. Today I set it up with a fresh installation of Debian 12.5,
assigned it the static IP address 192.168.1.15, and installed the LIGO CDS workstation packages. It is assigned the host name ws3.


Temporarily, the
mouse is borrowed from ws1 in 1119. We need to order another mouse as well as a 25-ft Ethernet cable for connecting the workstation to the 1129 switch,
    Reply  Wed Jun 26 15:33:41 2024, Jon, Infrastructure, Computers, New workstation ws3 in 1129 IMG_1368.jpg

Set-up of the first CDS workstation for 1129, ws3, is complete and the machine is ready for use. The login credentials are the same as the other lab
machines. 


All that now remains is to install a permanent cable tray for running the new Ethernet cables between the electronics rack and bench (they are
Entry  Wed Aug 9 11:32:56 2023, Jon, Infrastructure, General, New power cables IMG_0299.jpg
I delivered new NEMA 5-15 (120V / 15 A) power cables to the lab for the following items:

WS2 (cleanroom) cart - 10ft cable
Electronics workbench overhead LED - 10ft cable
Both PI heater controller sets - (2)
6ft cables

I installed the new cables on the WS2 cart and the workbench myself, and left the two 6ft cables (as pictured below) for Aiden
Entry  Tue Jun 27 15:18:26 2023, Pamella, Update, FLIR, New data collection FLIR_data.002.jpegFLIR_data_2.002.jpeg
  
[Pamella]



  Yesterday, I did a new data collection.  I could get a better data in this time and I realized than I need use some
angle on the reflector for got a better shot. I need do that because the FLIR camera just is able to get the triangle shape for complete if I keep exactly
in same line for center point on the camera but for the data now I need move the refletor to go up and go down. So wasn't working very well if I keep the
Entry  Tue Jun 13 21:33:46 2023, Pamella, Update, General, New cabinet for PPI 
[Pamella and Dr.Richardson]

Dr. Richardson installed the new cabinet outside the room for the PPI equipments, and then I wiped all surfaces inside
and outside of the new cabinet. 
 Dr.Richardson and I have finished organizing the PPI within the new cabinet. Also we have new supplies of gloves,
and will likely have more supplies for other PPIs soon. 
Entry  Fri Jul 14 16:49:42 2023, Pamella, Update, FLIR, New bridge and calibration data IMG_8606.jpeg
[Pamella]


Aiden 3D printed a new bridge for the heater and I installed the new bridge yesterday. 
 I started collecting data to plot
a calibration with the heater. I'm doing measurements with current and the thermocouple (thermometer) to compare with FLIR measurements and have a good
calibration.
Entry  Mon May 13 14:48:27 2024, Aiden, Update, VAC, New Vacuum Chamber Design VaccumChamberAssembly__Redesign_v5.jpg
I created a new model for the vacuum chamber based on the ideas from last week's meeting.

It should be noted that we can not have the zero length
reducer and the gate valve on the same arm as they both have blind tapped holes. We need to decide if we want the gate valve or not as if we do, we will
need to use the 3 inch long reducer.
 Important Measurements:

From the back of the flange to the back of the RGA: 25.25 in

Height from
Entry  Mon Jul 8 17:01:45 2024, Shane, Update, CDS, New CyMAC internal layout updated_cymac.jpeg
[Jon, Shane]

Internal layout of CyMAC has been updated (labeled image attached) to accommodate the replacement of the two ribbon cables. Looking down
on the chassis from the front, and going from left to right, the new placement is as follows: BIO card, DAC adapter board, ADC adapter board, DAC card,
ADC card. NOTE: As part of ADC-DAC loopback testing, we're disconnecting from the FROSTI readout chassis and using the cables to connect directly from
Entry  Tue May 30 14:51:27 2023, Pamella, Update, FLIR, New 3D mask - Bigger triangles shapes. AcquisitionImage(May-30-2023_14_38).jpgthumbnail_IMG-7303.jpg
[Pamella]

 Change the 3D mask 
 Started removing the old mask in the reflector.
 Started cutting the new aluminum lid for the
new 3D mask and assembling in the 3D mask.  
 Started doing the new cable connections for the light. 
 Started testing the resistance
in the new cable connections. The multimeter show us 14.2 Ω. 
 Started attaching the mask with the light and the thermometer sensor. 
Entry  Tue Jul 25 15:35:14 2023, Shane, Update, Electronics, More chassis moved IMG_8409.HEIC
Finished basic assembly of binary input and output chassis today, and moved one to top shelf of work bench. The other is in corner of work bench (image
attached). They are delicate, so please do not move them or place anything on top of them. 
Entry  Wed May 3 19:03:47 2023, Julian,Pamella and Cao, Physics, VAC, Modify vacuum asssembly and install RGA vaccum_chamber_re-configuration.jpg
[Pamella, Julian, Cao]

   Today we started re-configuring the vacuum chamber components. 

 Particle count 

 10:45 am : Starting
the particle count in the clean room. 
 11:13 am : Finished the particle count in the clean room. 




  Zone 3 :


 0.3 u: 2535 
 0.5 u: 1413 
 1.0 u: 789 


  Zone 4 :
  0.3 u: 457  
      0.5
Entry  Wed May 31 16:18:41 2023, Aiden, Summary, General, Mock FROSTI IMG_4394.jpg
Finished assembly on the Mock FROSTI so it is ready for the fit test at LIGO lab.
Entry  Mon Jul 8 12:26:10 2024, Michael, Update, Interferometer Simulations, Minimizing Astigmatic Effects in the SRC of LIGO 
This is the first look and analysis of the effects of astigmatism in the aLIGO optical layout which can lead to mode mismatch and therefore increased losses
into higher order modes. Specifically I am currently looking at measuring the effect of changing the radii of curvature of the SRC mirrors  https://docs.google.com/presentation/d/1qhIehqyNukg4g8S2fqfQZz83yr9aB76tEa6fn2J-TrM/edit?usp=sharing
Entry  Sat Feb 24 08:53:38 2024, Jon, Infrastructure, Computers, Matlab upgraded to 2023b on Chimay 
I upgraded Matlab on chimay to the latest stable release, 2023b. From some quick tests, it appears to be in working order. Let me know of any issues.
Entry  Thu Jan 2 17:52:58 2025, Luis, Update, VAC, MR Testing Continuation  2024-12-16_PostBake2_ArO_overlay.png2025-1-2_MR-Bake1_ArO.png2025-1-2_MR-Bake1_ArC_overlay.png
[Luis, Luke]
        RGA Volume: T = 22°C, P = 2.10e-9 Torr
        Main Volume: T = 21°C, P = 5.71e-9 Torr
    
Entry  Mon Dec 16 21:32:21 2024, Luis, Update, VAC, MR Testing IMG_6011.HEIC
[Luis, Luke]

The MR material was placed in the vacuum chamber following standard procedures to ensure the vacuum remained as clean as possible.
During this process, we only opened the main 
volume while keeping the gate valve between the two volumes closed to maintain the UHV in the RGA section.

An
RGA scan was taken before this process, this will be used to compare the state of the vacuum with the sample inside to determine whether the MR material
Entry  Sun Dec 22 20:43:35 2024, Luis, Update, VAC, MR Testing 2024-12-13_PostBake2_ArO_Degas_overlay.png2024-12-22_MR-Bake1_ArO.png
[Luis, Luke]
        RGA Volume: T = 23°C, P = 3.0e-9 Torr
        Main Volume: T = 22°C, P = 9.90e-9 Torr
    
    After letting the vacuum cool down for a couple days, we reattached the magnets and sensors, then we performed a RGA scan of the vacuum system,
Entry  Tue Nov 5 09:56:04 2024, Luis Martin, Update, Clean & Bake, MR Bake 
    [Luke, Luis]
    
        On Friday, 11/1/24, the MR was unpackaged and cleaned under the flow bench. We noticed an ink stain on one of the corners of the
material. After wiping it down with IPA and Vector Alpha wipes, the stain was removed. However, the material showed some wear. 
    
Entry  Mon Feb 19 14:40:21 2024, Shane, Update, CDS, MEDM screen for FROSTI temp readouts IMG_6094.jpegIMG_6092.jpeg
Here's the latest draft of the MEDM screen for the FROSTI heating elements' temperature readouts. Note that the MEDM screen isn't actually this grainy,
this just happens to be a photo of the lab monitor's screen off a phone. 
Entry  Thu Feb 29 17:16:48 2024, Shane, Update, CDS, MEDM screen for FROSTI T/P readouts IMG_6259.jpeg
Here's the latest draft of the MEDM screen for the FROSTI temp and power readouts, now with a button linking to the c1msc file display. Size/color/label
are all changeable, if adjustment is needed. Checked in execute mode as well, and it's working correctly. Also noticed that the MEDM file name has been
changed to FROSTI.adl, which I'm noting here for future reference. Still in medm_sandbox directory. 
Entry  Wed Feb 21 23:15:07 2024, Michael, Update, Interferometer Simulations, Long Shoelaces 1 Layout Created in Gtrace and Fixed Ghosting in Beamsplitter long_shoelaces1_desmos.JPGAR_side_with_reflection.PNGAR_side_without_reflection.PNG
I have created the long shoelaces 1 layout for cosmic explorer using gtrace, a slight modification from the shoelaces 1 layout design. I also modified the
simulation code slightly to remove ghosting effects in the beamsplitter. Originally the python code specified that the HR and AR sides of the beamsplitter
both have the same transmission/reflection. I modified this to the ideal case of: Refl_AR = 0, Trans_AR = 1. I have attached two images below to show the
Entry  Tue Feb 6 22:40:25 2024, Michael, Update, Scripts/Programs, Long Crab 1 Design Created In Gtrace Long_Crab1.pnglong_crab_1_desmos.PNG
Worked on and completed the python code for the simulation of the Long Crab 1 layout for Cosmic Explorer basing off of Pooyan's original work with the Crab
1 layout. From here I'll look into creating the shoelaces layouts.
Entry  Wed Nov 20 12:31:24 2024, Luis, Update, VAC, Leak test RGA Scan after vacuum repairs 2024-11-20_PostBake1_ArO.png
[Luke, Luis]
After the gasket replacement performed on Monday (11/18/24) we let the vacuum pump down to UHV pressure for a couple days. Today (11/20/24) we
measured the pressure to be 5.30*e^-9 with a temperature of 22C, and we performed a leak test and RGA Scan. 
Entry  Tue Nov 19 17:10:34 2024, Luke , Update, VAC, Leak check image.pngIMG_5116.jpegIMG_5117.jpeg
Chamber temperature: 23C
Chamber Initial Pressure: ~1.8e-8 main, ~3.5e-8 rga
Did another leak test after monday's work to check how the seal was holding up initial leak was 5.5e-9. I then tried to tighten the bolts a bit
Entry  Wed Oct 23 11:48:06 2024, Luis Martin, Update, VAC, Leak Test Results 
[Luke, Luis, Mary, Ma]
 On 10/22/24 Luke, Ma, Mary and myself ran a leak test, the results are displayed below. The overall pressure of the vacuum was 2.0e-8 and the
temperature readings were 26C for the RGA and 25C for the main volume. 