  264   Mon Nov 13 11:07:50 2023 TylerUpdateVACRTD Analysis
After initial analysis from last week
on a single RTD, I then extended to looking
at all 8 in series with R_ref (set to 1 kOhm).
 Screenshot_2023-11-13_at_11.05.45_AM.pngScreenshot_2023-11-13_at_11.06.04_AM.png 
  271   Mon Nov 20 10:10:50 2023 TylerConfigurationElectronicsRTD Logic/Schematic Diagrams
Below are a basic diagram of what the
RTD measurement circuit logically looks like
and an example schematic of the actual wiring.
 FIN_RTD_circuit.pngSample_Circuit_Schematic.png 
  274   Tue Nov 21 14:47:24 2023 TylerUpdateLore1129 Workbench Assembly Update 1
[Tyler, Shane, Mohak, Cynthia, Luke,
Michael, Luis]


Started assembly of the workbench
 IMG_7569.jpgIMG_7568.jpg 
  278   Mon Nov 27 14:22:30 2023 TylerUpdateLore1129 Assembly Update[Tyler, Michael, Luke, Cynthia]


The
tabletops have been attached to the workbench
frames. Unfortunately, one of the tabletops
 IMG_7669.jpgIMG_7668.jpg 
  281   Thu Nov 30 13:50:32 2023 TylerUpdateLoreWorkbench Assembly Completed[Tyler, Luke, Aiden]



The workbenches
are now completely assembled and put into
their final places. Additionally, the tool
 IMG_7686.jpg 
  300   Tue Jan 9 12:08:59 2024 TylerConfigurationElectronicsRTD Readout Chassis Update
Below is the current state of the RTD
readout chassis wiring. Initial continuity
tests seem good, will run through one more
 IMG_8105.jpg 
  305   Tue Jan 16 12:20:21 2024 TylerConfigurationElectronicsRTD Readout Chassis Update 2
I performed another continuity test on
the RTD chassis wiring, and everything seems
to be set up correctly. The chassis should
 IMG_8146.jpgIMG_8147.jpg 
  310   Tue Jan 23 12:17:41 2024 TylerUpdateElectronicsRTD Chassis
After updating the wiring in the RTD
Chassis, a signal is now seen at each ADC
input. However, there seems to be a discrepancy
 rtd_updated_circuitry.jpg 
  311   Tue Jan 30 11:36:19 2024 TylerUpdateElectronicsRTD Chassis



  
  323   Tue Feb 13 11:54:45 2024 TylerConfigurationFLIRIn-Air Optical Test Configuration
Below is the proposed schematic for FROSTI
optical testing, chosen so enough space is
allotted for prototype assembly.
 In-air_optical_test_sketch.png 
  324   Tue Feb 13 12:26:23 2024 TylerUpdateInterferometer SimulationsBS Code Update I reproduced Cao's CE beamsplitter code
(see below for example plots). I received
the current info on the beamsplitter parameters
 thickness1.pdfbs_opd_homloss_h6cm_w2cm.pdf 
  331   Tue Feb 20 11:31:49 2024 TylerUpdateCleanroomGarment Cabinet Door Replacement[Luis, Luke, Pooyan, Tyler]


The replacement
door for the HEPA garment cabinet arrived
last week, and was installed on Thursday.
 image_67190529.JPGimage_67177473.JPG 
  338   Fri Feb 23 18:03:27 2024 TylerUpdateFLIROptical Test Setup in Cleanroom[Tyler, Xuesi]

The FLIR and test mass
stand-in have been transferred into the cleanroom.
A software test will be run as soon as we
 IMG_0941.png 
  344   Wed Feb 28 12:02:08 2024 TylerUpdateGeneralResistors for Heater Elements UpdatePower         Res (Ohm) RTD Res (Ohm)

Heater
1= 72.8; 80.6

Heater 2= 69.5; 80.8

Heater
3= 70; 83.2

Heater 4= 70.6; 78.7

Heater
  
  345   Wed Feb 28 17:49:18 2024 TylerUpdateTCSFROSTI Assembly - Days 2-3[Aiden, Jon, Luis, Luke, Michael, Tyler]

FROSTI
assembly was completed today. The RTD and
power wires were terminated at the DB-25
 IMG_0947.pngIMG_0956.pngIMG_0957.pngIMG_0959.png 
  347   Wed Mar 6 09:57:52 2024 TylerUpdateTCSFROSTI Wiring Upon finishing the FROSTI assembly last
week, we ran into some electrical issues.
An electrical short was found between two
  
  349   Tue Mar 19 10:55:30 2024 TylerUpdateFLIRIn-Air Optical TestBelow is an image I took using the FLIR just
before leaving for the LVK meeting. The profile
is roughly what we would expect (annular).
 FroSTI_Thermal_Profile.png 
  351   Thu Mar 21 16:56:42 2024 TylerUpdateDAQRTD Parameter Calibration[Jon,Tyler]

 We noticed that the RTD
temperature readings given on the Cymac were
off, and traced the issue to miscalibration
 RTD_Calib-2.pngIMG_8569.jpg 
  354   Mon Mar 25 10:55:33 2024 TylerUpdateDAQRTD Parameter CalibrationRefitted RTD calibration, neglecting quadratic
term:

       R_0
(ohm)   Alpha (1/C)
 RTD_Calib_nobeta.png 
  355   Tue Mar 26 13:51:56 2024 TylerUpdateDAQRTD Parameter Calibration Another re-fit, but this time the quadratic
coefficient (beta) is set to 1.003e-6:


     R_0 (ohm)   Alpha
 Screenshot_2024-03-26_at_1.23.27_PM.png 
  364   Thu May 2 22:43:36 2024 TylerUpdateElectronicsRTD Readout Chassis Redesign[Tyler, Jon]


Today the FROSTI RTD
readout chassis underwent a redesign:



Instead of the original ratiometric
 IMG_9013.jpg 
  366   Mon May 13 13:03:41 2024 TylerUpdateFLIRReadout Code Updates[Tyler]


Some changes have been made
to the FLIR readout code to help improve
its functionality:


More accurate
 AcquisitionImage(Jul-18-2023_15_24).jpg.png 
  373   Mon Jun 3 14:14:39 2024 TylerUpdateFLIRInitial CIT FROSTI Analysis [Tyler]


Attached below are the initial
results of the CIT FROSTI testing analysis.
 CIT_FROSTI_Analysis_Group_Meeting-2.pdf 
  375   Mon Jun 10 14:52:38 2024 TylerUpdateFLIRCIT FROSTI Analysis Update[Tyler]


Upon further inspection, one
adjustment was made to the FROSTI profile
analysis: changing the transmission value
 FROSTI_HR_Temperature_Difference-7.png 
  416   Mon Jul 29 13:39:16 2024 TylerUpdateDAQRTD Parameter Calibration[Tyler]


Using the data taken during
the FROSTI testing at Caltech, I attempted
to find a better calibration of the RTD sensors,
 RTD_Recal_params.pngRTD_recal_plots_fin.png 
  417   Mon Jul 29 14:30:16 2024 TylerUpdateCleanroomRIN Measurement Set-up[Tyler]


I have begun moving parts
into the cleanroom for the upcoming FROSTI
RIN tests that will be conducted within the
 RIN_FROSTI.jpg 
  422   Mon Aug 12 16:24:34 2024 TylerUpdateCleanroomRIN Measurement Update 1[Tyler]


For some preliminary tests,
I moved the IR photodetectors outside of
the cleanroom and onto the other optical
 Basic_setup.jpgRP.jpg 
  434   Tue Sep 3 18:24:17 2024 TylerUpdateCDSCymac Timing Chassis Issue[Tyler, Jon]


The timing chassis used
for the cymac has been shut off due to an
unknown issue causing its supplied current
  
  442   Mon Sep 16 14:59:51 2024 TylerUpdateTCSFLIR RIN Update 09/16
Below is the dark noise spectrum of the
Red Pitaya, which was measured over the course
of a weekend. Additionally, I have successfully
 adc_noise_floor_photodectors.png 
  447   Mon Sep 23 15:11:21 2024 TylerUpdateScripts/ProgramsEffective Emissivity Analysis and RIN Update A quick update on the effective emissivity
analysis for the CIT FROSTI testing: 

 
I was able to (roughly) match
 OPD_Plot.pngTemp_emiss_plot.pngrin_photodectors.pngRIN_setup.jpg 
  453   Wed Oct 2 12:20:43 2024 TylerUpdateTCSUpdated FROSTI Analysis 10/02/2024Attached below are updates on current FROSTI
prototype analysis.
 FROSTI_Analysis_Updates.pdf 
  457   Wed Oct 9 13:52:31 2024 TylerUpdateTCSRIN Update 10/09/2024 I tried adjusting the gain settings on
the photodetectors to check if this would
help improve the RIN spectra measurements.
 RIN_plots_CH0.pdf 
  466   Tue Oct 29 16:37:35 2024 TylerUpdateElectronicsRed Pitaya OS Update The Red Pitaya ecosystem has been upgraded
to OS 2.00-35, with a key feature
being greater freedom in adjusting the sampling
  
  470   Wed Nov 13 14:03:32 2024 TylerUpdateElectronicsRIN Update[Tyler]


We've added two low-pass filters
in hopes of reducing any potential aliasing
that may be introducing additional noise
 IMG_0463.jpgCH0_CH1_ASDs.pdf 
  477   Wed Nov 20 12:59:37 2024 TylerUpdateElectronicsRIN UpdateI went ahead and compared the noise spectrum
of the ADC to those of the photodetectors
with the FROSTI on and off. As discussed
 ASD_plots.pdf 
  479   Wed Nov 27 13:48:01 2024 TylerUpdateElectronicsRIN Update[Tyler]

 
I downgraded the Red Pitaya
back to OS 2.00-18 due to runtime errors
during measurement. Once I did this, the
 New_ASD_plots.pdf 
  486   Wed Dec 11 13:39:30 2024 TylerUpdateElectronicsRIN Update 12/11/2024[Tyler]


Attached below are updated
ASD plots for the FROSTI RIN measurements.
The parameters set for this are the following:
 Updated_ASD_plots.pdf 
  492   Wed Dec 18 15:41:56 2024 TylerUpdateTCSFROSTI RIN[Tyler]


I have begun the (hopefully)
final RIN measurements at 3:30 PM today.
If you need to go into the cleanroom at any
  
  495   Mon Dec 23 14:33:36 2024 TylerUpdateTCSLatest RIN Measurement ResultsAttached below are the measurements I took
from the FROSTI from 12/18-12/22.
 Updated_ASD_plots.pdfDark_Noise_Thermal_ASD_plots.pdfDC_Voltages.pdfRP-2.jpg 
  498   Tue Jan 14 10:27:14 2025 TylerUpdateTCSRIN Updates[Tyler]


Attached below are updated
plots for the FROSTI RIN measurements for
Jan 14 group meeting.
 ASD_plots_01_14_2025.pdf 
  499   Fri Jan 17 13:27:07 2025 TylerUpdateTCSFROSTI Pre-disassembly[Tyler, Ma, Cece, Jon, Luke, Cynthia, Michael]

On
Tuesday, we prepared the FROSTI for disassembly
in anticipation of the APS filming that is
 IMG_1828.jpegIMG_1830.jpeg 
  501   Wed Jan 22 10:50:08 2025 TylerUpdateTCSFROSTI Disassembly[Tyler, Ma, Cece, Luis, Shane, Luke, Cynthia,
Liu, Jon]

On Tuesday (Jan 21), we took
the FROSTI apart in front of a filming crew.
 IMG_1843.pngIMG_1844.pngIMG_1849.pngIMG_1850.png 
  516   Tue Feb 18 10:12:39 2025 TylerUpdateTCSFinal RIN Plot Update
Below is a preview of the final RIN figure
that will be included in the FROSTI instrument
paper. A quick summary of what is shown below:
 Preliminary_RIN_plot.pdfFROSTI_ON.pdfDark_Noise.pdfADC_Noise.pdf 
  531   Tue Mar 4 10:28:58 2025 TylerUpdateTCSRIN Plot Updates   Dark_bin_veto.pdfMock_final_plot_inst.pdf 
  542   Tue Mar 25 12:56:47 2025 TylerUpdateTCSFROSTI Analysis FinalizationUpon final review of the FROSTI analysis
included in the (hopefully) soon-to-be submitted
instrument paper, I've made some adjustments
 FROSTI_OPD_profile.pdfFROSTI_temperature_profile.pdf 
  570   Tue May 6 12:25:03 2025 TylerConfigurationCDSCymac ADC CSD measurementAn initial measurement of the cymbal ADC CSD
is attached below. As of now, it seems that
the sensitivity limit is roughly the same
 cymac_adc_rin_v1.pdf 
  577   Tue May 13 12:41:06 2025 TylerUpdateTCSA# Profiles UpdateSlides on the A# ITM FROSTI profile modeling
efforts can be found here.
  
  595   Tue Jun 17 12:46:47 2025 TylerUpdateElectronicsCyMAC ADC NoiseBelow are results from power spectra measurements
of the CyMAC ADC, computed form 30 hours
of time series data, compared to the performance
 cymac_v_rp_csds.pdfchi_sq_cymac_v_rp.pdf 
  597   Tue Jun 24 12:45:16 2025 TylerUpdateGeneralUpdated ADC spectra[Tyler]

Updated ADC noise spectra measurements
using diaggui. 

 NOTE: Will update plots
 csd_spec.pngchi_sq.png 
  602   Tue Jul 1 12:39:42 2025 TylerUpdateTCSA# FROSTI Profile Optimization Update[Tyler, Liu]