ID Date Author Type Category Subject Text Attachments
  68   Tue Apr 11 17:56:15 2023 PamellaUpdateGeneralLab cleaning Today Pamella and Julian finished cleaning
of the cleanroom, starting with the HEPA
vacuuming, mopping and clearing all floor
  
  67   Tue Apr 11 13:15:40 2023 CaoInfrastructureClean & BakeNitrogen gas tank replacedThe nitrogen gas tank has been replaced with
a new unit. The new tank is ultra pure nitrogen
(>99.9% nitrogen).

The new tank has been
  
  66   Fri Apr 7 09:48:09 2023 PamellaUpdateGeneralClean the system partsPamella and Julian wiped and tag system parts
for the vacuum machine. We used isopropyl
and vectra wipes in the most import pieces:
 7x 
  65   Thu Apr 6 10:20:43 2023 PeterUpdateVLC UpdateLaser intensity/polarization drift measurementsMore optical components were added to the
optical set up for laser intensity / polarization
drift measurements. Both lenses and both
 Optical_Setup_4-6-23.jpg 
  64   Tue Apr 4 16:52:08 2023 JonUpdateCleanroomParticle counter docking stationDue to the problems we have encountered trying
to serially communicate directly with the
Met One DR-528 particle counter, I went ahead
 Met_One_Dock.png 
  63   Tue Apr 4 16:43:53 2023 JonUpdateVLC ElectronicsAdditional Thorlabs PDA10A2I ordered a second PDA10A2 and mounting post
+ spacer (which puts the aperture at the
VLC's standard 3" beam height). These arrived
 PDA10A2.png 
  62   Tue Apr 4 09:53:37 2023 PeterUpdateVLC UpdateLaser intensity/polarization drift measurementsThe set up for the next round of beam characterization
measurements has begun. The beam is initially
passing through a half waveplate, is split
 initial_Intens_measure_set_up.jpg 
  61   Tue Apr 4 09:39:58 2023 PeterUpdateVLC Electronics532 M2 MeasurementsFinal M squared measurements were taken Wednesday,
3/29/23 by Peter and Ryan Hinosawa. 5 separate
sets of data were taken, and upon discussion,
 OmegaY_M2_Fit_8.pdfOmegaX_M2_Fit_8.pdfM2_Measurements_Set_Up.svgBeam_Data_8_3lens.txt 
  60   Mon Apr 3 17:04:05 2023 AidenSummaryGeneralIDP Scroll Pump AssemblyAiden installed the isolation valve and the
exhaust silencer kits on the IDP-3 Scroll
pump. The entire assembly still needs to
 IMG_4244.jpg 
  59   Fri Mar 31 14:23:13 2023 PamellaUpdateGeneralClean and bake batch 11Today I bagged and tagged batch 11. I wiped
the some tools: Centering ring alum( 2 pieces),
reversible ratcheting, gasket removal (CF).
 4AC705B8-D906-47E3-86E4-49E4967910E7.jpeg 
  58   Wed Mar 29 16:00:36 2023 PamellaUpdateCamerasFLIR project
Today Pamella and Tyler started  work in
the updates for the FLIR project. 
We trie
for the first time cover the mirrors with
 15D13FE3-48A9-4ACF-9422-07032DD8D028.jpeg 
  57   Fri Mar 24 13:36:17 2023 PamellaUpdateGeneralClean and Bake batch 10Today I bagged and tagged batch 10.
 I wiped
the RGA vacuum component for around 25 minutes
after that I bagged and tagged this part
 260AEB73-02D0-4635-93B3-B2EB3269FB84.jpeg59FD199A-A444-439A-8D51-C242B65BBECD.jpeg9A48A0EE-5EFE-409D-ACC0-17011F6F7EBF.jpeg950F85B7-D304-4724-AB3D-B606E422F1E3.jpeg 
  56   Fri Mar 24 07:14:38 2023 JonInfrastructureComputersWorkstation 2 (ws2) mounted on cleanroom cartThe ws2 cart has been thoroughly wiped down
with IPA wipes and moved inside the cleanroom.
I have reconnected it to power and Ethernet
  
  55   Thu Mar 23 18:40:08 2023 JulianUpdateGeneralCleanroom UpdateToday Pamella and I came in to Hepa vacuum
and mop the floor of the cleanroom for general
maintenance. 
  
  54   Wed Mar 22 15:25:00 2023 ShaneUpdateGeneralClean room recertification particle counts Attached are the five zone particle measurements
for the clean room now that the fan speeds
have been set to MEDIUM. 2 min sample time,
 counts3.22.23.pdf 
  53   Wed Mar 22 12:16:20 2023 JonInfrastructureCleanroomExperimenting with HEPA fan speedsJon, Cao
In effort to try to reduce the noise
level inside the cleanroom, we have dialed
  
  52   Fri Mar 17 19:46:39 2023 AidenSummaryGeneralClean and Bake batch 9Bagged and Tagged the reflector arms and bases
and placed them inside the clean room. Total
of 2 bags used. Cleaned and Baked parts in
 IMG-4208.jpgIMG-4209.jpg 
  51   Tue Mar 14 18:21:41 2023 AidenSummaryGeneralClean and Bake batch 8Starting off Peter and I refilled the deionized
water barrel.

Then Aiden Cleaned and Bake
the FROSTI arms and bases in liquinox for
  
  50   Fri Mar 10 12:08:09 2023 PeterUpdateVLC Electronics532 M2 MeasurementsTook more M2 laser data today. The configuration
is the same as before except now the beam
camera is the only component moving. Pictures
 OmegaX_M2_Fit_4.pngOmegaY_M2_Fit_4.png 
  49   Thu Mar 9 13:51:42 2023 ShaneUpdateGeneralClean room counts 3/9/23Here's the clean room counts from this morning.
Also attached is rough diagram of where the
five zones are in the clean room. Counts
 particlecounts3.9.23.pdfclean_room_zones.JPG 
  48   Thu Mar 9 12:03:59 2023 PeterUpdateVLC Electronics532 M2 MeasurementsTook more M2 Data today. Picture of the optical
set up is shown below. lens1 f = 100mm, lens2
f = 50mm, lens3 f = 150mm. There was a nice
 OmegaY_M2_Fit_3.pngOmegaX_M2_Fit_3.pngoptical_setup.jpg 
  47   Wed Mar 8 19:29:00 2023 AidenSummaryGeneralClean and Bake batch 7Today gave another cleaning to the MDC gate
valve. It is still very dirty an will need
more cleaning. I also cleaned the other 3
 IMG_4180.jpgIMG_4182.jpg 
  46   Wed Mar 8 18:35:52 2023 PamellaUpdate Lab cleaning Today Pamella finished cleaning of the cleanroom,
starting with the HEPA vacuuming,  mopping
and clearing all floor with IPA wipes. 
Also
  
  45   Mon Mar 6 18:48:43 2023 PamellaUpdateGeneralCleanroom update Today Pamella and Julian finished cleaning
of the new lab cabinets. Also we wiped the
computer and  put inside the cleanroom so
 203863E0-106A-465E-8D9C-461B0358FB60.jpeg779F360D-CAD0-4C49-AE0B-973F97F6D099.jpeg276B9F0C-6661-441F-AD34-D79DA61E1FC3.jpeg 
  44   Mon Mar 6 15:32:58 2023 JonInfrastructureGeneralCabinet installation completedJon, Cao, Peter
This morning Facilities delivered
and installed two new cabinets with sliding
 IMG_0088.jpgIMG_0089.jpg 
  43   Sat Mar 4 00:34:46 2023 JulianUpdateGeneralCleanroom UpdateToday I was able to finish cleaning the frame
of the laser table, and for good measure
I wiped down the tabletop and exterior of
  
  42   Fri Mar 3 19:13:33 2023 AidenSummaryGeneralClean and Bake Batch 6Started to clean the dirtiest of the valves.
I could not finish but I definitely made
good progress on it. The MDC valve is very
 IMG_4173.jpgIMG_4174.jpg 
  41   Thu Mar 2 20:53:56 2023 JulianUpdateGeneralCleanroom UpdateToday Pamella and Julian began the final cleaning
of the cleanroom, starting with the HEPA
vacuuming and mopping then wiping down every
  
  40   Wed Mar 1 21:50:46 2023 JonInfrastructureComputersWorkstation 2 (ws2) mounted on cleanroom cartThe Linux workstation (ws2) that used to
sit on the blue workbench (now inside the
cleanroom) has been mounted on a mobile cart,
 ws2_cart-1.jpegws2_cart-2.jpeg 
  39   Wed Mar 1 21:27:20 2023 JonInfrastructureCleanroomOver-table shelf height raisedJon, Cao

Today we raised the height of the
shelf overhanging the cleanroom laser table
 cleanroom-shelf.jpg 
  38   Tue Feb 28 19:37:22 2023 AidenSummaryGeneralClean and Bake batch 5Bagged and Tagged batch 4 parts by placing
no more than two part numbers per bag and
taped them with kapton tape and labeled them
 IMG_4168.jpgIMG_4169.jpgIMG_4170.jpg 
  37   Tue Feb 28 19:33:51 2023 PeterUpdate 532 M2 MeasurementsY axis of plot in units of micrometers. X
axis in units of millimeters. 
  
  36   Tue Feb 28 19:31:05 2023 PeterUpdateVLC Electronics532 M2 MeasurementsTook M2 measurements today. Configuration:
Lens 1 (f = 50mm) at 0mm. Lens 2 (f = 150mm)
at 200mm, camera at 350mm. The laser beam
 X_width_and_Y_width.png 
  35   Tue Feb 28 13:53:17 2023 PamellaUpdateGeneralVacuum chamber cleaning Pamella, Dr. Richardson and Dr.Cao finished
checking and cleaning the interior of the
chamber, chamber lid, and exterior of the
 EE5E0296-D362-4EA6-B482-85A629D93B46.jpeg4C0AA805-667E-45AD-8704-03389BD63489.jpeg51CE3D1E-F48E-4F57-8450-8F58C27154BB.jpeg58ADE656-52AD-4F0E-88BA-B993F977A519.jpeg 
  34   Mon Feb 27 17:09:04 2023 Pamella UpdateGeneralVacuum Chamber CleaningPamella and Julian finished cleaning the interior
of the chamber, chamber lid, and the table.
We found some black residue on the side of
 Side_of_Table.jpegWipes_from_table.jpeg 
  33   Thu Feb 23 21:12:33 2023 JulianUpdateGeneralVacuum Chamber CleaningToday I was able to come in and wipe down
both sides of the vacuum chamber lid using
the regular alcohol wipes and also wipes
 ChamberLid_inside.jpgChamberLid_outside.jpgVacuumChamber_inside.jpg 
  32   Thu Feb 23 13:32:55 2023 ShaneUpdateGeneralClean room floor particle countsHere are the counts from the clean room floor
today. The counts should be dated- the ones
from today (2/23/23) are the last 8 in the
 2.23.2023.pdf 
  31   Tue Feb 21 17:51:04 2023 AidenSummaryGeneralClean and Bake batch 4Bagged and Tagged batch 3 parts by placing
no more than two part numbers per bag and
taped them with kapton tape and labeled them
 IMG_4148.jpgIMG_4147.jpg 
  30   Fri Feb 17 19:12:39 2023 AidenUpdateGeneralClean and Bake batch 3Bagged and Tagged batch 2 parts by placing
no more than two parts per ESD bag then taped
them with kapton tape and tagged them with
 IMG_4126.jpgIMG_4125.jpg 
  29   Mon Feb 13 18:57:53 2023 AidenSummaryGeneralClean and Bake batch 2Cleaned second batch of SS parts with liquinox
for 20 min. Then put in oven for 5 steps;
1. Ramp, 100 degC, 15 min 2. Const, 100 degC,
  
  28   Sat Feb 11 17:09:29 2023 ShaneUpdateGeneralclean room particle counts 2/10/23Took a round of clean room counts after the
latest clean of vacuum chamber on Feb 10.
Used 60 second sample time, 5 samples for
 occupied2.10.23.pdfunoccupied2.10.23.pdfparticlecounts2.10.23.PDF 
  27   Sat Feb 11 00:17:27 2023 JulianUpdateGeneralVacuum Chamber CleaningToday I finished wiping down the rest of the
vacuum chamber, specifically focusing on
the connecting ports and outside surface
 20230210_181404.jpg20230210_181424.jpg20230210_181541.jpg20230210_181606.jpg 
  26   Fri Feb 10 16:34:45 2023 Huy Tuong CaoInfrastructureClean & BakeNitrogen gas tank ready to useCao,


Today I fixed the final bit related
to the nitrogen gas tank, which is to apply
sealing tape to M-NPT connector of the hose
 AirGunSealed.jpg 
  25   Fri Feb 10 15:15:30 2023 AidenUpdateGeneralBagging First BatchAiden Bagged and Tagged the first batch of
stainless steel parts shown on the google
spread sheet. 
1. Removed two parts from
  
  24   Tue Feb 7 17:44:17 2023 JonInfrastructureComputersWorkstation 1 (ws1) set upThe Linux workstation (ws1) that used to sit
on the old workbench has been mounted on
the new electronics bench and is now ready
 ws1.jpg 
  23   Tue Feb 7 17:27:30 2023 AidenPhysicsELOGClean and Bake Batch #1Cleaned SS parts with liquinox for 20 min.
Then put in oven for 5 steps;
1. Ramp, 100
degC, 15 min
2. Const, 100 degC, 30 min
3.
  
  22   Mon Feb 6 20:02:32 2023 JulianUpdateGeneralCleanroom UpdateI wiped down the main table (including frame,
legs, and transparent shelf) and workbench
using alcohol wipes. Once I cleaned all of
  
  21   Sat Feb 4 17:01:03 2023 PeterUpdateVLC ElectronicsLaser DataPeter and Ryan took laser beam data. Configuration:
100mm focal length lens is ~100mm from lens.
150mm focal length lens is ~200mm from first
 OmegaX_M2_Fit_3.pngOmegaY_M2_Fit_3.png 
  19   Fri Feb 3 13:04:04 2023 shaneSummaryGeneralclean room particle counts 1/25/23Clean room count graphs for each zone (as
of January 25, 2023) attached
 cleanroomcountsJan25.pdf 
  18   Fri Jan 27 18:44:31 2023 Julian UpdateGeneralVacuum Chanmber CleaningI used the IPA wipes to wipe down the inside
of the chamber the best I could. I cleaned
the main chamber but not any of the connecting
  