ligo-ex
ligo-ds
Richardson Lab Experimental Log, Page 11 of 13
Not logged in
List
|
Find
|
Login
|
Help
Full |
Summary
|
Threaded
|
Hide attachments
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Configuration
Update
Summary
HowTo
Bureaucracy
Infrastructure
Physics
-- Category --
General
CDS
TCS
VAC
DAQ
Safety
Computers
Scripts/Programs
Electronics
Cameras
Wiki
ELOG
Equipment Loan
Lore
VLC Electronics
Clean & Bake
Cleanroom
VLC Update
FLIR
Measuring Noise in Interferometer
Interferometer Simulations
640 Entries
Goto page
Previous
1
,
2
,
3
...
10
, 11,
12
,
13
Next
ID
Date
Author
Type
Category
Subject
41
Thu Mar 2 20:53:56 2023
Julian
Update
General
Cleanroom Update
Today Pamella and Julian began the final cleaning of the cleanroom, starting with the HEPA vacuuming and mopping then wiping down every surface of the laser table. We wiped the main tabletop as well as the legs, but we were unable to completely wipe down the upper frame of the table before we had to leave. For next steps, Julian will come in on Friday and finish cleaning the frame, then both of us will come in on Monday to finish the final cleaning.
43
Sat Mar 4 00:34:46 2023
Julian
Update
General
Cleanroom Update
Today I was able to finish cleaning the frame of the laser table, and for good measure I wiped down the tabletop and exterior of the vacuum chamber when I was finished. I was also able to go through and wipe down the bags containing the vacuum parts as well as the tabletop of the workbench.
55
Thu Mar 23 18:40:08 2023
Julian
Update
General
Cleanroom Update
Today Pamella and I came in to Hepa vacuum and mop the floor of the cleanroom for general maintenance.
580
Wed May 21 14:40:38 2025
Xuesi Ma
Infrastructure
Cleanroom
Cleanroom Temperature
Date and Time:
Around 2:20 PM on May 21, 2025
Location and Temperature:
Back of the room, around the working station: 85.5 °F
Front of the room, around the doorway: 82.3 °F