Entry  Wed Apr 12 16:13:19 2023, Cao, Physics, VAC, Vacuum prep and installation VacAssy230412.png
    Reply  Fri Apr 21 00:06:43 2023, Jon, Update, VAC, Vacuum prep and installation - parts have arrived SS_parts.png
Message ID: 70     Entry time: Wed Apr 12 16:13:19 2023     Reply to this: 74
Author: Cao 
Type: Physics 
Category: VAC 
Subject: Vacuum prep and installation 
Aiden, Pamella, Peter, Shane, Cao

Today we started vacuum chamber assembly work

  • 10:16 am: Particle count measurement of clean room
  • 10:34 am: Particle counting finished: meets ISO 5 standard
    1. Zone 3 :
      • 0.3 u: 3159
      • 0.5 u: 789
      • 1.0 u: 83
    2. Zone 4 :
      • 0.3 u: 498
      • 0.5 u: 41
      • 1.0 u: 0
  • 10:45 am: Assemble vacuum feedthrough
  • 11:08 am: Finish assembling feedthrough
  • 11:14 am: Assemble inverted magnetron pirani gauge
  • 11:29 am: Finish assembling magnetron gauge
  • 11:31 am: Assemble calibrated Ar Leak
  • 11:47 am: Finish assembling Ar leak
  • 11:49 am: Assemble up to up-to-air valve
  • 11:59 am: Finish assembling up-to-air valve
  • 12:00 pm: Break for Lunch
  • 1:00 pm: Came back from lunch
  • 1:20 pm: Assemble 45 degree elbow [RGA Line]
  • 1:35 pm: Finish assembling 45 degree elbow
  • 1:35 pm: Assemble Reducing nipple [Pump Line]
  • 1:49 pm: Finish assembling Reducing nipple
  • 1:53 pm: Attempt to install gate valve [Pump line] but bolts could not fit to the gap between 2.5" reducing nipple (0.95" length, shortest 5/16 bolt is 1.5" in total length).
    Thickness of of CF flange on reducing nipple is 0.75" inch. Ideally, we want to have 0.2" engagement to the gate valve, thus0.95" + 0.25" head thickness = 1.2" > 0.95" gap.
    We thus most likely will need a replacement for the reducing nipple. We decided we would hold up on installing the rest of the pump line until we have got components to fix this problem

  • 2:05 pm: Assemble gate valve [RGA line]
  • 2:15 pm: Finish assembling gate valve [RGA line]
  • 2:18 pm: Assemble 4-way cross [RGA line]
  • 2:30 pm: Finish assembling 4- way cross [RGA line]
  • 2:37 pm: Assemble manual bellow sealed angle valve [RGA line]
  • 2:43 pm: Finish assembling sealed angle valve [RGA line]
  • 2:45 pm: Assemble inverted magnetron pirani gauge [RGA line]
  • 2:55 pm: Finish assembling magnetron pirani gauge [RGA line]
  • 2:56 pm: Assemble vacuum hose, thin wall [RGA line]
  • 3:04 pm: Finish assembling vacuum hose, thin wall [RGA line]
  • 3:45 pm: Packing up for the the day
  • 4:00 pm: End-of-date particle count measurement
    1. Zone 3
      • 0.3 u: 1080
      • 0.5 u: 124
      • 1.0 u: 83
    2. Zone 4
      • 0.3 u: 540
      • 0.5 u: 83
      • 1.0 u: 83