We have completed the preliminary reorganization of our Physics 1119 lab space. This includes:
- Moving all cabinets to their final positions
- Clearing out all equipment from the cleanroom in prep for HVAC work, and storing them in either the HEPA cabinet or double-bagging in regular storage.
- Moving all non-essential equipment into other lab spaces.
- Wrapping vacuum system and VLC for protection
- Removing all ceiling tiles and fans from the ceiling of the cleanroom
- Moving the cleanroom frame towards the front of the room.
Prepping the new clean-and-bake station in 1125 will begin within the next week, along with the construction of the stainless steel table planned to be put into the cleanroom.
| Quote: |
| Attached are the starting and final floor plans for the February 2026 expansion into the Physics 1125 lab. |
|