ligo-ex ligo-ds
  Richardson Lab Experimental Log  Not logged in ELOG logo
Entry  Tue Jul 9 18:19:50 2024, Shane, Update, CDS, ADC-DAC loopback testing and IOLAN installation iolanServerTerminal.jpegADC-DAC_Loopback_Testing.xlsxupdatedc1msc.jpeg
    Reply  Tue Jul 16 18:43:07 2024, Shane, Update, CDS, ADC-DAC loopback testing and IOLAN installation Follow-up_ADC-DAC_Loopback_Testing.xlsx
Message ID: 399     Entry time: Tue Jul 9 18:19:50 2024     Reply to this: 410
Author: Shane 
Type: Update 
Category: CDS 
Subject: ADC-DAC loopback testing and IOLAN installation 
[Shane, Jon]

Finished ADC-DAC loopback testing today (see attached xlsx file or access directly here). All looks well with the first 8 channels, with the gain hovering just under 2. Also edited c1msc model in simulink to add channels 7-15 (the last 8 channels), and changed the rate back to 64K. See image 1 for the updated c1msc model. The last 8 channels are also looking good and show no problems, with slightly more scattering for the gain, but all values very close to 2.

We also installed the new eight-channel Perle IOLAN SDS8 terminal server today. Image attached.

NOTE: When we were installing it, we noticed an energized wire dangling from the 24V power supply. Has since been fixed and put back into place.

Attachment 1: iolanServerTerminal.jpeg  3.271 MB  | Show | Hide all | Show all
Attachment 2: ADC-DAC_Loopback_Testing.xlsx  7 kB
Attachment 3: updatedc1msc.jpeg  3.534 MB  | Show | Hide all | Show all
ELOG V3.1.3-7933898