ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 6 of 11  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Type Categorydown Subject
  540   Tue Mar 11 11:28:52 2025 CynthiaUpdateInterferometer Simulationsflattening mirror to study power discrepency
  2   Thu Jun 2 16:14:58 2022 JonHowToGeneralCustom conda environment on JupyterHub

Cross-linking instructions: How to run a Jupyter notebook in your custom Conda environment

  7   Mon Jul 11 14:29:45 2022 JonOmnistructureGeneralHEPA filter installed
Today I unpacked and installed the new HEPA filter for the lab. It is an Omni CleanAir OCA1210 capable of 1200 CFM. This flow rate is sufficient to turn over the air in the room once every 4 minutes, or 14 times per hour. Hopefully this will cut down on our particulate accumulation issues.
  16   Mon Jan 23 17:26:15 2023 Peter CarneyUpdateGeneralOven cleaning
Aiden and Cao Turned on the oven to 120 deg C for 12 hours. After 12 hours, put it at 200 deg C for 48 hours.
  17   Thu Jan 26 18:58:25 2023 AidenUpdateGeneralOven Heating
Aiden cleaned the oven with methanol again and set the oven to 260 degC for 12 hours.
  18   Fri Jan 27 18:44:31 2023 Julian UpdateGeneralVacuum Chanmber Cleaning
I used the IPA wipes to wipe down the inside of the chamber the best I could. I cleaned the main chamber but not any of the connecting joints. When I finished I did a once over with a fresh wipe and found no residue.
  19   Fri Feb 3 13:04:04 2023 shaneSummaryGeneralclean room particle counts 1/25/23
Clean room count graphs for each zone (as of January 25, 2023) attached
  22   Mon Feb 6 20:02:32 2023 JulianUpdateGeneralCleanroom Update
I wiped down the main table (including frame, legs, and transparent shelf) and workbench using alcohol wipes. Once I cleaned all of the surfaces, I used the Hepa vacuum to pick up any fallen debris.
  25   Fri Feb 10 15:15:30 2023 AidenUpdateGeneralBagging First Batch
Aiden Bagged and Tagged the first batch of stainless steel parts shown on the google spread sheet. 1. Removed two parts from the oven. 2. Place them in the ESD bag. 3. Seal bag with Kapton Tape. 4. Create label including part name and number underneath it. 5. Put label onto the side of the bag where it is not sealed with tape. 6. Placed bagged items into clean room on work table. ps. total bags in first batch = 4
  27   Sat Feb 11 00:17:27 2023 JulianUpdateGeneralVacuum Chamber Cleaning
Today I finished wiping down the rest of the vacuum chamber, specifically focusing on the connecting ports and outside surface of the chamber. When I was finished, I test wiped every surface of the chamber and took pictures confirming the current state of cleanliness; Attachment 1 "Wipes for top and bottom of chamber's upper lip." Attachment 2 " Top and bottom of chamber's lower lip." Attachment 3 "Inside and Outside main chamber." Attachment 4 "Inside connecting ports."
  28   Sat Feb 11 17:09:29 2023 ShaneUpdateGeneralclean room particle counts 2/10/23
Took a round of clean room counts after the latest clean of vacuum chamber on Feb 10. Used 60 second sample time, 5 samples for each of the 5 zones. Plots attached for both occupied clean room (one person inside, attachment 1) and unoccupied clean room (empty attachment 2), as well as the raw data from the particle counter (attachment 3).
  29   Mon Feb 13 18:57:53 2023 AidenSummaryGeneralClean and Bake batch 2
Cleaned second batch of SS parts with liquinox for 20 min. Then put in oven for 5 steps; 1. Ramp, 100 degC, 15 min 2. Const, 100 degC, 30 min 3. Ramp, 200 degC, 30 min 4. Const, 200 degC, 48 hours 5. Ramp, 25 degC, (off).
  30   Fri Feb 17 19:12:39 2023 AidenUpdateGeneralClean and Bake batch 3
Bagged and Tagged batch 2 parts by placing no more than two parts per ESD bag then taped them with kapton tape and tagged them with their name and part number. Than placed them inside the clean room on the work bench. Total of 3 Bags used. For Batch 3- Cleaned all copper gaskets with liquinox for 10 minutes, dried them off with nitrogen, then placed into oven where the are currently undergoing the following steps; 1. Ramp to 100 deg C in 15 minutes. 2. Dwell at 100 degC for 30 minutes. 3. Ramp to 175 degC in 30 minutes. 4. Dwell at 175 degC for 24 hours. 5. Turn off and cool down to room temperature. To see the specific parts in batches 2 and 3 refer to the clean and bake data sheet. https://docs.google.com/spreadsheets/d/19gnv1q9l64gxnq76KfcXizbqShJfK0ayn2Js1SiAZok/edit?skip_itp2_check=true#gid=1549161924
  31   Tue Feb 21 17:51:04 2023 AidenSummaryGeneralClean and Bake batch 4
Bagged and Tagged batch 3 parts by placing no more than two part numbers per bag and taped them with kapton tape and labeled them with their name and part number. Then placed them in the clean room on the work bench. Cleaned batch 4 parts with liquinox and placed the into the oven for 5 steps; 1. Ramp to 100 degC in 15 minutes. 2. Dwell at 100 degC for 30 minutes. 3. Ramp to 200 degC in 30 minutes. 4. Dwell at 200 degC for 48 hours. 5. Turn off and cool down to room temperature. To see the specific parts in batch 4 please refer to the Clean and Bake spread sheet on the Richardson lab page: https://docs.google.com/spreadsheets/d/19gnv1q9l64gxnq76KfcXizbqShJfK0ayn2Js1SiAZok/edit#gid=1765414234
  32   Thu Feb 23 13:32:55 2023 ShaneUpdateGeneralClean room floor particle counts
Here are the counts from the clean room floor today. The counts should be dated- the ones from today (2/23/23) are the last 8 in the chart. The first set of 2 measurements from today were under the table by the clean room entrance, the next two were under the table by the vacuum chamber, the next two were on the floor by the vacuum chamber lid, and the last two were on top of the table for comparison. All measurements were taken using 2 minute sample time.
  33   Thu Feb 23 21:12:33 2023 JulianUpdateGeneralVacuum Chamber Cleaning
Today I was able to come in and wipe down both sides of the vacuum chamber lid using the regular alcohol wipes and also wipes that were left to dry in the fume hood then saturated with acetone. I managed to get a good amount of the residue off both the inside and outside surfaces of the lid, then did a test wipe of both sides using acetone-soaked wipes; pictures of the wipes are attached below. Once I finished with the lid, I used another acetone wipe to test wipe the inside of the vacuum chamber. The inside is still giving off residue, but very minimally, a photo for this is attached as well.
  34   Mon Feb 27 17:09:04 2023 Pamella UpdateGeneralVacuum Chamber Cleaning
Pamella and Julian finished cleaning the interior of the chamber, chamber lid, and the table. We found some black residue on the side of the table but not sure what the issue is. A picture of the specific area of the table that is giving off the black residue is attached below. The next step from here would be to flip the chamber on its side and finish the cleaning the exterior.
  35   Tue Feb 28 13:53:17 2023 PamellaUpdateGeneralVacuum chamber cleaning
Pamella, Dr. Richardson and Dr.Cao finished checking and cleaning the interior of the chamber, chamber lid, and exterior of the chamber with Vectra Alpha wipes, IPA and in some parts we used acetone . We flip the chamber and put chamber on the table again. A picture of the specific situation is attached below. The next step from here would be to finish the cleaning the floor . The black residues on the side of the table probably is some reaction between the Vinil and the wipes so is not necessary cleaning this part deeply.
  38   Tue Feb 28 19:37:22 2023 AidenSummaryGeneralClean and Bake batch 5
Bagged and Tagged batch 4 parts by placing no more than two part numbers per bag and taped them with kapton tape and labeled them with their name and part number. Then placed them in the clean room on the work bench. Cleaned batch 5 part (Viton O-Ring) with liquinox and placed the into the oven for 5 steps; 1. Ramp to 100 degC in 15 minutes. 2. Dwell at 100 degC for 30 minutes. 3. Ramp to 180 degC in 30 minutes. 4. Dwell at 180 degC for 48 hours. 5. Turn off and cool down to room temperature. To see the specific parts in batch 5 please refer to the Clean and Bake spread sheet on the Richardson lab page: https://docs.google.com/spreadsheets/d/19gnv1q9l64gxnq76KfcXizbqShJfK0ayn2Js1SiAZok/edit#gid=1765414234 Hand cleaned stainless steel containers and silver coated screws. Designated each container with its contents with the label maker and placed inside the clean room. Should be noted that the fasteners were very clean before the hand cleaning and showed not dirt on the wipes. Added these parts to the clean and bake data base sheet and designated the type of cleaning as "rough cleaning". Gabriella helped with this cleaning and today was her first day in the lab.
  41   Thu Mar 2 20:53:56 2023 JulianUpdateGeneralCleanroom Update
Today Pamella and Julian began the final cleaning of the cleanroom, starting with the HEPA vacuuming and mopping then wiping down every surface of the laser table. We wiped the main tabletop as well as the legs, but we were unable to completely wipe down the upper frame of the table before we had to leave. For next steps, Julian will come in on Friday and finish cleaning the frame, then both of us will come in on Monday to finish the final cleaning.
  42   Fri Mar 3 19:13:33 2023 AidenSummaryGeneralClean and Bake Batch 6
Started to clean the dirtiest of the valves. I could not finish but I definitely made good progress on it. The MDC valve is very dirty and there are many places I could not reach with my fingers. I used Acetone and IPA for this first round of cleaning on it. I also was going to bag the viton O-Ring from the previous Batch, however it seems to have broken during the bake and I am leaving it inside the oven for now.
  43   Sat Mar 4 00:34:46 2023 JulianUpdateGeneralCleanroom Update
Today I was able to finish cleaning the frame of the laser table, and for good measure I wiped down the tabletop and exterior of the vacuum chamber when I was finished. I was also able to go through and wipe down the bags containing the vacuum parts as well as the tabletop of the workbench.
  44   Mon Mar 6 15:32:58 2023 JonInfrastructureGeneralCabinet installation completed

Jon, Cao, Peter

This morning Facilities delivered and installed two new cabinets with sliding glass doors.

The smaller of the two (36" W x 13" D x 84" H) has been installed in the Clean & Bake area adjacent the flow bench. The larger one (48" x 16" D x 84" H) has been installed in the back of the room next to the electronics bench. Both cabinets have been securely anchored to the wall in two places each for earthquake safety.

We also installed the sliding glass doors and leveled them. However, we have not installed any of the shelves yet because the cabinets are quite dirty from the installation. Everything needs to be wiped down with IPA wipes, and it will be easier to do that before the shelves are in place.

  45   Mon Mar 6 18:48:43 2023 PamellaUpdateGeneralCleanroom update
Today Pamella and Julian finished cleaning of the new lab cabinets. Also we wiped the computer and put inside the cleanroom so now the computer is not move out side anymore. We saw some dirty parts in the cleanroom floor again and is possible for the next step we should be clearing the floor one more time. Possible is necessary order more IPA wipes for keep cleaning in nexts weeks. A photos of the cabinets and the computer are attached below.
  47   Wed Mar 8 19:29:00 2023 AidenSummaryGeneralClean and Bake batch 7
Today gave another cleaning to the MDC gate valve. It is still very dirty an will need more cleaning. I also cleaned the other 3 valves and the argon leak. These are also in bags inside the clean room. I cleaned them by hand with IPA wipes and had to specifically give the MDC up to air valve a harder clean with acetone as it was not getting clean with the IPA. This valve still has a ring around the face as shown in the first image. Be very cautious when moving the parts in the large ESD bag, it may be heavy and the parts will move inside.
  49   Thu Mar 9 13:51:42 2023 ShaneUpdateGeneralClean room counts 3/9/23
Here's the clean room counts from this morning. Also attached is rough diagram of where the five zones are in the clean room. Counts taken with 2 minute sample time, three samples in each zone.
  51   Tue Mar 14 18:21:41 2023 AidenSummaryGeneralClean and Bake batch 8
Starting off Peter and I refilled the deionized water barrel. Then Aiden Cleaned and Bake the FROSTI arms and bases in liquinox for 5 minutes. Then placed them in the oven where they will undergo the following steps; 1. Ramp to 100 degC in 15 min. 2. Dwell at 100 degC for 30 min. 3. Ramp to 120 degC in 30 min. 4. Dwell at 120 degC for 48 hours. 5. OFF Also cleaned the 2.75 MDC Gate valve for 20 minutes (10 minutes each side) in liquinox. It looks significantly cleaner in areas I could not reach before. However some areas like the flat bottom threaded holes are still very dirty. I also made sure to dry it thoroughly and wrapped it in UHV foil until I further cleaning is decided.
  52   Fri Mar 17 19:46:39 2023 AidenSummaryGeneralClean and Bake batch 9
Bagged and Tagged the reflector arms and bases and placed them inside the clean room. Total of 2 bags used. Cleaned and Baked parts in batch 9 on the spread sheet and used the following procedure; 1. Ramp to 100 degC in 15 min. 2. Dwell at 100 degC for 30 min. 3. Ramp to 200 degC in 30 min. 4. Dwell at 200 degC for 48 hours. 5. OFF Also soaked the 2.75" CF gate valve in acetone to try and clean the open threads around the part. Then cleaned it in the ultrasonic washer with liquinox for 20 minutes (10 minutes each side). It looks better than it used to but the threads still seem to be the problem and will probably need even further cleaning.
  54   Wed Mar 22 15:25:00 2023 ShaneUpdateGeneralClean room recertification particle counts
Attached are the five zone particle measurements for the clean room now that the fan speeds have been set to MEDIUM. 2 min sample time, 3 samples per zone. The occupied clean room measurements were unusual in that they generally got larger towards minute 6 instead of settling and going to zero, and for this reason didn't stay beneath the class 5 requirement at the end of the samples. The unoccupied counts look more similar to what was expected, and generally settle under the class five requirement.
  55   Thu Mar 23 18:40:08 2023 JulianUpdateGeneralCleanroom Update
Today Pamella and I came in to Hepa vacuum and mop the floor of the cleanroom for general maintenance.
  57   Fri Mar 24 13:36:17 2023 PamellaUpdateGeneralClean and Bake batch 10
Today I bagged and tagged batch 10. I wiped the RGA vacuum component for around 25 minutes after that I bagged and tagged this part and put inside the cleanroom. The RGA vacuum component have a big size and because off that i used the big bag. I wiped one power cable (2 meters), bagged and tagged that and inside the cleanroom. For the parts in the oven, a bunch of screws, I bagged and tagged the screws and put inside the cleanroom. I put photos below about this process.
  59   Fri Mar 31 14:23:13 2023 PamellaUpdateGeneralClean and bake batch 11
Today I bagged and tagged batch 11. I wiped the some tools: Centering ring alum( 2 pieces), reversible ratcheting, gasket removal (CF). After wiped that I bagged and tagged this parts and put inside the cleanroom. Also I wiped one power cable (3 meters), bagged and tagged that and inside the cleanroom. I put photo below.
  60   Mon Apr 3 17:04:05 2023 AidenSummaryGeneralIDP Scroll Pump Assembly
Aiden installed the isolation valve and the exhaust silencer kits on the IDP-3 Scroll pump. The entire assembly still needs to be wiped down but overall no residue came off when putting on the kits.
  66   Fri Apr 7 09:48:09 2023 PamellaUpdateGeneralClean the system parts
Pamella and Julian wiped and tag system parts for the vacuum machine. We used isopropyl and vectra wipes in the most import pieces: Inverted magnetron pirani gauge and the air cooling kit 81. The other parts we uses the IPA wipe for cleaning. So for now we finished with ever system parts which was in the gabinetes. I put photos below. The photos is for all part we cleaning, tag and which puted inside the cleaning room.
  68   Tue Apr 11 17:56:15 2023 PamellaUpdateGeneralLab cleaning
Today Pamella and Julian finished cleaning of the cleanroom, starting with the HEPA vacuuming, mopping and clearing all floor with IPA wipes. Also we wiped down some surfaces of the blue table, computer table and the top of chamber.
  69   Wed Apr 12 10:53:02 2023 AidenSummaryGeneralValve Cleaning
Bagged and Tagged the parts from batch 10 and placed them inside the clean room. Then cleaned the last gate valve in liquinox for 20 minutes (10 minutes each side). Then dried the valve, bagged, tagged, and placed it inside the clean room.
  71   Wed Apr 12 16:17:50 2023 shaneUpdateGeneralParticle Counter moved
With the added height of the new docking station, the particle counter no longer fits under the Windows monitor in the electronics rack and has been moved to the desk in the corner of the lab.
  72   Mon Apr 17 17:06:49 2023 AidenSummaryGeneralClean and Bake batch 11
Cleaned the Viton O-Ring for the main chamber in Liquinox for 10 minutes. Then put it in the oven to back for; 1. Ramp to 100 degC in 15 min. 2. Dwell at 100 degC for 30 min. 3. Ramp to 180 degC in 30 min. 4. Dwell at 180 degC for 24 hours. 5. Off Note: There were three viton -rings in the bag sent to us. I cleaned and baked 2 of them and left the third in the bag.
  76   Fri Apr 21 16:51:26 2023 PamellaUpdateGeneralCleaning cables.
Cables for the vacuum system.
  • Today i wiped, bagged and tagged two cables for the vacuum system. I used IPA wipes for cleaning this two split power cord. I attached a image below.
  77   Mon Apr 24 17:38:45 2023 AidenSummaryGeneralClean and Bake Batch 12
Today I Bagged and tagged the o-rings from batch 11 and placed them inside the clean room. I also cleaned batch 12 parts in liquinox for 10 minutes and them placed them into the oven where they will undergo the following steps; 1. Ramp to 100 degC in 15 min. 2. Dwell at 100 degC for 30 min. 3. Ramp to 200 deg C in 30 min. 4. Dwell at 200 deg C for 48 hours. 5. Off
  80   Thu Apr 27 09:48:34 2023 AidenSummaryGeneralBatch 12 Bagging
I took batch 12 out of the oven and put them in a bag and placed the bag inside the clean room in the first large stainless steel container. I also looked at the small gauge that we felt like needed to be baked and I can confirm that without further cleaning around the inside of the gauge it should not be connected to the main vacuum. I have attached a photo of the inside of the gauge.
  86   Fri Apr 28 19:39:19 2023 CaoSummaryGeneralClean and Bake Leybold TTR 91 Pirani Gauge

Quote:
I took batch 12 out of the oven and put them in a bag and placed the bag inside the clean room in the first large stainless steel container. I also looked at the small gauge that we felt like needed to be baked and I can confirm that without further cleaning around the inside of the gauge it should not be connected to the main vacuum. I have attached a photo of the inside of the gauge.

 

Following the problem with contamination particles observed in the the Leybold thermovac TTR 91, we have taken the following step to clean the gauge:

  1. Wipe with IPA-wetted Vectra Alpha: Cover the tip of a ziptide with Vectra Alpha wipe corner that has been wetted with IPA, push the wipe around and remove visible particulates
  2. Fill the gauge flange with IPA: (following Jon's recommendation to use Lesker's procedure for cleaning their Pirani gauge), flip the gauge up such that the CF flange points upward, fill the flange with IPA all the way up. Use the tip of a SSTL tweezer to agitate the IPA. Let it sits for 20 minutes, agitate every 5 minutes. After 20 minutes, pour the IPA out then spray with dry pure nitrogen
  3. Passive drying : Let the gauge sit inside the flowbench for 3 hours (3:30 pm to 6:30 pm)to ensure all IPA has evaporated
  4. Baking : Leave the gauge in oven at 50 degree C for 48 hours (maximum allowed temperature is 65 deg C, we use 50 deg C to ensure we are well below this limit). Baking started at 7pm, should finish on Sunday 7pm and ready for assembling to vacuum chamber on Monday morning

  93   Mon May 8 12:00:03 2023 Pamella, Shane, JulianUpdateGeneralCleanroom particle counts and cleaning the cleanroom.
[Pamella,Julian, Shane]
    Today we cleaned the clean-room (floor, surfaces) and particle count.
    10:00 am: Started particle count.
  • Zone 3:
  • 0.3u: 1330
  • 0.5u: 540
  • 1.0u: 415
  • Zone 4:
  • 0.3u: 290
  • 0.5u: 83
  • 1.0u: 0
    Clean-room:
  • 10:30 am: Started wiping down the surfaces inside the clean-room
  • 10:41 am: Finished wiping down the surfaces inside the clean-room and Started vacuuming the clean-room.
  • 10:58 am: Finished vacuuming the clean-room.
  • 11:00 am: Started mopping on the floor.
  • 11:20 am: Finished mopping on the floor and started wiping on the floor.
  • 11:34 am: Finished wiping on the floor.
  • 11:35 am: Started the particle count.
  • 11:57 am: Finished the particle count.
  • Zone 3
  • 0.3u: 997
  • 0.5u: 290
  • 1.0u: 207
  • Zone 4
  • 0.3u: 374
  • 0.5u: 207
  • 1.0u: 207
  96   Wed May 10 10:49:34 2023 AidenUpdateGeneralRGA Software
[Aiden, Cao] Went over how to use the RGA software, how to change the graph units, scaling and mass detection. Also went over how to remove the RGA from the vacuum system as well as procedure for turning it on.
  100   Wed May 17 12:18:08 2023 Pamella, Julian and Shane UpdateGeneralCleaning room and particle count
[Pamella, Julian and Shane]
    Particle count:
  • 10 am: Started particle count
    1. Zone 3 :
      • 0.3u: 1288
      • 0.5u: 332
      • 1.0u: 124
    2. Zone 4 :
      • 0.3u: 498
      • 0.5u: 166
      • 1.0u: 83
  • 10:40 am: Checked the surfaces inside the cleanroom.
  • 10:50 am: Started vacuuming the cleanroom.
  • 11:15 am: Started mopping the cleanroom.
  • 11:35 am: Started wiping the cleanroom floor.
  • 11:40 am: Finished cleaning the cleanroom.
  • 11:41 am: Started the particle count.
  • 12:17 am: Finished the particle count.
    1. Zone 3 :
      • 0.3u: 3782
      • 0.5u: 706
      • 1.0u: 207
    2. Zone 4 :
      • 0.3u: 374
      • 0.5u: 83
      • 1.0u: 83
  109   Wed May 31 11:42:16 2023 Pamella, Julian and ShaneUpdateGeneralCleaning room and particle count
[Pamella, Shane and Julian]
    Cleaning room and particle count
  • 09:58 am: Started the particle count
    1. Zone 3:
    2. 0.3u : 1,995
    3. 0.5u : 540
    4. 1.0u : 0
    5. Zone 4:
    6. 0.3u : 124
    7. 0.5u : 0
    8. 1.0u : 0
  • 10:25 am: Started checking the surfaces inside the cleanroom.
  • 10:30 am: Started vacuuming the floor.
  • 10:45 am: Finished vacuuming the floor.
  • 10:46 am: Started mopping the floor.
  • 10:58 am: Finished mopping the floor.
  • 11:00 am: Started wiping floor with polypropylene wipes.
  • 11:03 am: Started and finished cleaning the mop buckets.
  • 11:15 am: Finished wiping floor with polypropylene wipes.
  • 11:16 am: Changed sticky floor mats.
  • 11:20 am: Started the particle count.
    1. Zone 3:
    2. 0.3u : 2,951
    3. 0.5u : 872
    4. 1.0u : 207
    5. Zone 4:
    6. 0.3u : 374
    7. 0.5u : 83
    8. 1.0u : 0
  111   Wed May 31 16:18:41 2023 AidenSummaryGeneralMock FROSTI
Finished assembly on the Mock FROSTI so it is ready for the fit test at LIGO lab.
  115   Tue Jun 6 16:04:46 2023 AidenUpdateGeneralWater
Aiden went and refilled the de-ionized water to continue clean and bake batches.
  119   Mon Jun 12 18:52:00 2023 PamellaUpdateGeneralHeater system parts - Wiped and bagged
[Pamella]
    Cleaning the heater system parts.
  • 04:32 pm: Started wiping the heater system parts.
  • 06:38 pm: Finished wiping the heater and some parts to the system. I wiped, tagged and bagged the heater system, power cables, adapter cables and power connectors. Also I wiped, bagged and tagged the aluminum foil tape.
  • 06:43 pm: I putted all bags inside the cleanroom.
  • To do: I started but I was not able to finished wiping the heating and cords for the heater system so I will finished this parts after.
  • I attached the photos below.
      120   Tue Jun 13 10:28:50 2023 PamellaUpdateGeneralWiped and bagged the heating and cords.
    [Pamella]
    • Cleaning the heater system parts.
    • 09:13 am: Started wiping the last parts for the heater system (heating and cords).
    • 10:18 am: Finished wiping the parts to the heater system (heating and cords). I wiped, tagged and bagged the heating and cords.
    • Note: In some parts looks like the silicone insulation material is having some sort of residue on the wipe so I wiped very careful this part and just for a few minutes.
    • 10:23 am: I putted all bags inside the cleanroom.
      I attached the photos below.
    ELOG V3.1.3-7933898