ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 16 of 16  Not logged in ELOG logo
Entry  Tue Feb 18 11:19:13 2025, Luke , Configuration, VAC, Repositioning of the lid's temperature probe 
Entry  Tue May 6 12:25:03 2025, Tyler, Configuration, CDS, Cymac ADC CSD measurement cymac_adc_rin_v1.pdf
ELOG V3.1.3-7933898