ligo-ex ligo-ds
  Richardson Lab Experimental Log, Page 14 of 14  Not logged in ELOG logo
ID Date Author Type Categorydown Subject
  594   Tue Jun 17 12:22:43 2025 Xuesi MaUpdate  
CYMAC Remote Control Cable Documentation

CYMAC Remote Control Cable Assembly

Cable Functions

The custom cable assembly serves two primary functions:

1. Jumper Connections (DB25 Side - Connector J3)

The following pins are jumpered on the DB25 connector:

From Pin To Pin
Pin 3 Pin 16
Pin 10 Pin 11
Pin 12 Pin 24
Pin 13 Pin 25
Pin 22 Pin 23

2. Signal Wiring (DB9 to DB25)

The following connections are made between the DB9 and DB25 connectors:

DB9 Pin DB25 Pin Function
Pin 1 Pin 9 Positive side
Pin 6 Pin 12 Negative side
Pin 5 Pin 6 Ground

Note: All connections are verified with a multimeter.

Note: This cable allows remote control of the Sorensen power supply with an external voltage source (Cymac DAC).

Note: For more details, check section 2.11.1 from the attached Sorensen power supply manual.

  596   Tue Jun 24 11:50:15 2025 Xuesi MaUpdate  
Heater Element Resistance Test Results

Heater Element Resistance Test Report

Test Overview

Conducted several on-and-off tests on heater elements at 24V, followed by switching heater elements 5 and 8 by changing their connection pins to the ADC.

Resistance Measurements (Ω)

Heater Element Before Switch After Switch Ladder Test Difference (After-Before)
Element 1 153.09577918 153.11447008 153.83373894 +0.0186909
Element 2 149.70967557 149.8175605 150.08915205 +0.10788493
Element 3 157.88314236 157.87136021 157.39696467 -0.01178215
Element 4 146.80153622 146.78826747 147.77923177 -0.01326875
Element 5 151.80888657 152.2204132 150.44919044 +0.41152663
Element 6 148.24375881 148.32846152 146.89161192 +0.08470271
Element 7 144.72286546 144.76879963 145.03627875 +0.04593417
Element 8 151.4564267 149.14240417 149.88675562 -2.31402253

Supporting Graphs

Attached below are the resistance-time graphs for all heater elements:

  • Complete test duration graph
  • Pre-switch period graph
  • Post-switch period graph
  • Resistance voltage graph after removing data from after power outage

Analysis & Conclusion

The switch did not physically change the resistance of the heater elements, suggesting the measurements reflect their true resistances.

  603   Tue Jul 1 13:41:36 2025 Xuesi MaUpdate  
[Ma, Liu]

Slides

  610   Mon Jul 14 23:50:22 2025 TylerUpdate Cymac ADC update

I've been looking into the performances of individual channels on the Cymac by computing their individual PSDs and corresponding CSDs that show their noise relation to each other. It appears some channels do have lower noise floors than others, and some combinations of these actually do perform similar to the Red Pitaya (showing below the CSD between CHs 3 and 5), although it doesn't look like it's much of an improvement. The best method as of now still appears to be phase-locking two separate ADCs to reduce the correlated noise floor further.

This can be further discussed at the July 22, 2025 group meeting.

  613   Tue Jul 15 11:47:53 2025 Xuesi MaInfrastructure  

Date and Time: Around 4:50 PM on July 1, 2025

Location and Temperature:

  • Back of the room 1119, around the working station: 85.7 °F
  • Front of the room 1119, around the doorway: 83.5 °F
  • Back of the room 1129, around the working station: 79.1 °F
  • In the hallway in front of room 1119: 76.5 °F
  620   Thu Jul 31 14:26:58 2025 Xuesi MaUpdate  

[Tyler, Ma, Christina, Maple, Cece, Mary, Pooyan, Audrey]

We started by cleaning outside of the cleanroom wiping down the cable channel and working our way down while taking the pre-cleaning measurement. We then stated wiping down the inside of clean room and vacuumed, mopped the outside of the cleanroom. Finally, we vacuumed, mopped, and wiped down the floor inside the cleanroom.

Particle Count Measurements:

  • Pre-cleaning (2:00 pm):
    • Zone 3:
      • 0.3 µm: 2707
      • 0.5 µm: 1374
      • 1.0 µm: 249
    • Zone 4:
      • 0.3 µm: 2207
      • 0.5 µm: 1166
      • 1.0 µm: 374
  • Post-cleaning (4:30 pm):
    • Zone 3:
      • 0.3 µm: 4082
      • 0.5 µm: 2415
      • 1.0 µm: 708
    • Zone 4:
      • 0.3 µm: 1707
      • 0.5 µm: 791
      • 1.0 µm: 416
  621   Tue Aug 5 11:25:17 2025 MaryUpdate point absorber and coated aperture in A#

Simulating how point absorber defects on Advanced LIGO mirrors affect cavity performance by modeling a 4km LIGO-like arm cavity with a point absorber fixed at 5cm off-center on the ITM. In this simulation, displaced the laser beam across a 21×21 grid while calculating the deformation, then measuring the resulting power loss in the cavity (~283W circulating power).

  623   Wed Aug 6 16:31:37 2025 Xuesi MaUpdate  

Date and Time: Around 4:20 PM on Auguest 6, 2025

Location and Temperature:

  • Back of the room 1119, around the working station: 90.2 °F
  • Front of the room 1119, around the doorway: 85.8 °F
  • Back of the room 1129, around the working station: 93.4 °F
  • Front of the room 1119, around the doorway: 82.3 °F
  • In the hallway in front of room 1119: 77.2 °F
  626   Tue Aug 12 12:35:19 2025 TylerUpdate CyMAC ADC Update
[Christina, Ma, Tyler]

Updated CyMAC measurement, comparing 260 hrs of measurement time vs. 405 hrs.

  629   Tue Aug 12 13:46:56 2025 ChristinaUpdate  
  630   Tue Aug 12 13:49:24 2025 MaryUpdate point absorber and coated aperture in A#
  638   Tue Sep 2 12:34:02 2025 Xuesi MaUpdate Updata for self heating effect on HOM
https://docs.google.com/presentation/d/19I1fx5BLEzYb4Qnc9P4rJnYAvWI8NqE2dsj9gSPyYzg/edit?usp=sharing
  641   Tue Sep 9 12:01:38 2025 Tyler, MaUpdate  
Slides
  644   Tue Sep 9 13:08:44 2025 Xuesi MaUpdate  
Slides
  671   Thu Jan 22 13:12:29 2026 MaryUpdate  
  675   Thu Jan 29 12:46:22 2026 Cece OchoaUpdate CE Cavity Design Update (4)
Update for CE Cavity Arms + Modes https://docs.google.com/presentation/d/1-dXYylkAbNpHR4WVCx9Q8ryL_xGlH-JSSLXEUQg6b7Q/edit?usp=sharing
ELOG V3.1.3-7933898