Entry  Wed May 3 19:03:47 2023, Julian,Pamella and Cao, Physics, VAC, Modify vacuum asssembly and install RGA vaccum_chamber_re-configuration.jpg
    Reply  Tue May 9 15:49:20 2023, Jon, Infrastructure, VAC, Permanent cable routing 
Message ID: 91     Entry time: Wed May 3 19:03:47 2023     Reply to this: 94
Author: Julian,Pamella and Cao 
Type: Physics 
Category: VAC 
Subject: Modify vacuum asssembly and install RGA 
[Pamella, Julian, Cao]
    Today we started re-configuring the vacuum chamber components.
    Particle count
  • 10:45 am : Starting the particle count in the clean room.
  • 11:13 am : Finished the particle count in the clean room.
  • Zone 3 :
    • 0.3 u: 2535
    • 0.5 u: 1413
    • 1.0 u: 789
  • Zone 4 :
    • 0.3 u: 457
    • 0.5 u: 290
    • 1.0 u: 207
      Starting the reconfiguration.
    • 11:21 am: Started removing up-to-air valve
    • 11:30 am: Finished removing up-to-air valve.
    • 11:33 am: Started removing calibrated Ar Leak and the elbow.
    • 11:35 am: Finished removing calibrated Ar Leak and started assembling the up-to-air valve.
    • 11:47 am: Finished assembling up-to-air valve.
    • 11:48 am: Started removing magnetron gauge.
    • 11:55 am: Finished removing magnetron gauge.
    • 11:57 am: Started installing the elbow and calibrated Ar Leak and started removing the RGA probe
    • 12:13 pm: Finished installing the elbow and calibrated Ar Leak.
    • 12:20 pm: Break for lunch.
    • 01:25 pm: Come back from lunch break.
    • 01:30 pm: Started removing RGA line.
    • 01:39 pm: Finished removing RGA line.
    • 01:39 pm: Started removing gate valve [RGA line] and finished removing gate valve.
    • 02:00 pm: Started installing gate valve in the new position.
    • 02:08 pm: Fished installing gate valve [RGA line].
    • 02:09 pm: Checked the screws in the elbow to gate valve. [RGA line].
    • 02:28 pm: Finished checking the screws in the elbow to gate valve [RGA line].
    • 02:29 pm: Started installing RGA line.
    • 02:39 pm: Finished installing RGA line.
    • 02:50 pm: Started installing magnetron gauge.(In this part we assembled gauge with the used gasket)
    • 03:02 pm: Finished installing magnetron gauge.
    • 03:04 pm: Started installing RGA probe [RGA line].
    • 03:13 pm: Finished installing RGA probe [RGA line].
    • 03:15 pm: Connected the cables to the magnetron gauge.
    • 03:20 pm: Started the testing in the vacuum chamber.
    • 04:30 pm: Started installing the RGA 200 and connected the cables (power cable and DB9 cable).
    • 04:52 pm: Finished installing the RGA 200 and connected the cables (power cable and DB9 cable).
    • 04:53 pm: Started testing the RGA connections. Logrus is able to recognize and connect to RGA unit. We are leaving the turbo pump on for a few hours before checking back for pressure readouts.
    • 05:00 pm : Starting the particle count in the clean room.
      1. Zone 3 :
        • 0.3 u: 2244
        • 0.5 u: 997
        • 1.0 u: 207
      2. Zone 4 :
        • 0.3 u: 2993
        • 0.5 u: 1579
        • 1.0 u: 498
    • 05:30 pm : Finished the particle count in the clean room.
    • 05:34 pm: Test pressure readout from the gauges.
      1. Channel 1 : 1.06E-5 mbar
      2. Channel 2 :8.89E-6 mbar
      3. Channel 3 :5.0E-4 mbar
    • 05:59 pm: Test pressure readout from the gauges.
      1. Channel 1: 9.09E-6 mbar
      2. Channel 2: 7.75E-6 mbar
      3. Channel 3: 5.0E-4 mbar
Attachment 1: vaccum_chamber_re-configuration.jpg  129 kB  | Show | Show all