ligo-ex ligo-ds
  Richardson Lab Experimental Log  Not logged in ELOG logo
Entry  Thu Apr 27 09:48:34 2023, Aiden, Summary, General, Batch 12 Bagging IMG_4279.jpgIMG_4278.jpg
    Reply  Fri Apr 28 19:39:19 2023, Cao, Summary, General, Clean and Bake Leybold TTR 91 Pirani Gauge 
Message ID: 80     Entry time: Thu Apr 27 09:48:34 2023     Reply to this: 86
Author: Aiden 
Type: Summary 
Category: General 
Subject: Batch 12 Bagging 
I took batch 12 out of the oven and put them in a bag and placed the bag inside the clean room in the first large stainless steel container. I also looked at the small gauge that we felt like needed to be baked and I can confirm that without further cleaning around the inside of the gauge it should not be connected to the main vacuum. I have attached a photo of the inside of the gauge.
Attachment 1: IMG_4279.jpg  41 kB  | Hide | Hide all
IMG_4279.jpg
Attachment 2: IMG_4278.jpg  126 kB  | Hide | Hide all
IMG_4278.jpg
ELOG V3.1.3-7933898