ligo-ex ligo-ds
  Richardson Lab Experimental Log  Not logged in ELOG logo
Message ID: 75     Entry time: Fri Apr 21 15:21:18 2023
Author: Pamella 
Type: Update 
Category: FLIR 
Subject:  
FLIR project updates
  • 01:50 pm: Starting test position 34 mm distance to black wall.
  • Parameters : 0.100 A, 1.5 V and the temperature inside the mirrors 40°C.
  • 2:09 pm : Finished the test and figured out this position it is too far the black wall so now we change for more close position.
  • 2:17 pm: Starting test in another position: 10 mm distance to the black wall( this measurement is between the black wall and the aluminum lid)
  • 2:26 pm : Finished this second tried and take a snap. The image is attached below.
  • The name for the picture for this tried is “AcquisitionImage(Apr-21-2023_14 26)”.
    Note: The second tried the temperature didn't up more than 40°C for 8 minutes so I change the current for a few seconds. I started with 0.98 A with 1.7 V and up until 0.350 A with 2.5 V, just for a few seconds and in this way the temperature up to 72°C and I get the snap.
      The next step should be understand the problem with the shape and work in changes for get the triangle in the FLIR image.
Attachment 1: AcquisitionImage(Apr-21-2023_14_26).jpg  33 kB  | Show | Show all
ELOG V3.1.3-7933898