Entry  Wed Apr 12 16:13:19 2023, Cao, Physics, VAC, Vacuum prep and installation VacAssy230412.png
    Reply  Fri Apr 21 00:06:43 2023, Jon, Update, VAC, Vacuum prep and installation - parts have arrived SS_parts.png
Message ID: 74     Entry time: Fri Apr 21 00:06:43 2023     In reply to: 70
Author: Jon 
Type: Update 
Category: VAC 
Subject: Vacuum prep and installation - parts have arrived 

The two parts needed to complete the vacuum assembly (ELOG 70) have arrived.

  • (10) 5/16"-24 x 1 3/4" threaded rods - for attaching the turbo pump reducing nipple to the CF 4.5" gate valve;
  • (1) 45 degree CF 2.75" elbow for attaching the calibrated Ar/He leak to the chamber.

I left them laying on top of the ultrasonic washer. They both need to cleaned and baked following the standard procedure for stainless steel, as the threaded rods are visibly dirty.