ligo-ex ligo-ds
  Richardson Lab Experimental Log  Not logged in ELOG logo
Message ID: 73     Entry time: Wed Apr 19 17:39:50 2023
Author: Pamella 
Type: Update 
Category: FLIR 
Subject: FLIR project 
    FLIR project updates- Initial tests
  • 10:00: Starting test in position 2 cm to the black wall.
  • Parameters : 0,305 A, 05,5 V and the temperature inside the mirrors 141,8°C.
  • 10:23 Finished this first tried and take snap. The image is attached below.
  • The name for the picture for this tried is “AcquisitionImage(Apr-19-2023_10 23)”.
  • 10:37. Starting test in another position now 3 cm distance to the black wall ( this is more close than the original position.)
  • Parameters : 0,348 A, 05,5 V and the temperature inside the mirrors 160,3°C.
  • 10:57 Finished this second tried and take a snap. The image is attached below.
  • The name for the picture for this tried is “AcquisitionImage(Apr-19-2023_10 57)”.
  • 11:03 Starting test another position 1.3 cm distance to black wall.
  • Parameters : 0,347 A, 05,5 V and the temperature inside the mirrors 158,7°C.
  • 11:18 Finished this second tried and take a snap. The image is attached below.
  • The name for the picture for this tried is “AcquisitionImage(Apr-19-2023_11 18)”.
    The next step should be fix the problem with the shape (aluminum foil lid).
Attachment 1: AcquisitionImage(Apr-19-2023_10_23)(1).jpg  31 kB  | Hide | Hide all | Show all
AcquisitionImage(Apr-19-2023_10_23)(1).jpg
Attachment 2: AcquisitionImage(Apr-19-2023_10_57)_(1).jpg  32 kB  | Hide | Hide all | Show all
AcquisitionImage(Apr-19-2023_10_57)_(1).jpg
Attachment 3: AcquisitionImage(Apr-19-2023_11_18)_(2).jpg  33 kB  | Show | Hide all | Show all
ELOG V3.1.3-7933898