ligo-ex ligo-ds
  Richardson Lab Experimental Log  Not logged in ELOG logo
Message ID: 65     Entry time: Thu Apr 6 10:20:43 2023
Author: Peter 
Type: Update 
Category: VLC Update 
Subject: Laser intensity/polarization drift measurements 
More optical components were added to the optical set up for laser intensity / polarization drift measurements. Both lenses and both PDs were added to the configuration, as seen in the image below. The beam is already well aligned into the center of both of PDs, and focused nicely by the lens. Both PD's take BNC connecting cables, and the Red Pitaya takes SMA connecting cables. Since we are currently without a BNC to SMA cable, and we do not want to cut, strip, and crimp what we have, then measurement process cannot proceed until we get the cables.
Attachment 1: Optical_Setup_4-6-23.jpg  1.496 MB  | Show | Show all
ELOG V3.1.3-7933898