ligo-ex ligo-ds
  Richardson Lab Experimental Log  Not logged in ELOG logo
Message ID: 62     Entry time: Tue Apr 4 09:53:37 2023
Author: Peter 
Type: Update 
Category: VLC Update 
Subject: Laser intensity/polarization drift measurements 
The set up for the next round of beam characterization measurements has begun. The beam is initially passing through a half waveplate, is split at a polarizing beam splitter, and then stirring mirrors are used to properly aim the beam into photodiodes (not yet installed). This is the current configuration of the set up.
Attachment 1: initial_Intens_measure_set_up.jpg  1.421 MB  | Hide | Hide all
initial_Intens_measure_set_up.jpg
ELOG V3.1.3-7933898