ligo-ex
ligo-ds
|
Richardson Lab Experimental Log |
Not logged in |
|
|
Message ID: 62
Entry time: Tue Apr 4 09:53:37 2023
|
Author: |
Peter |
Type: |
Update |
Category: |
VLC Update |
Subject: |
Laser intensity/polarization drift measurements |
|
|
The set up for the next round of beam characterization measurements has begun. The beam is initially passing through a half waveplate, is split at a polarizing beam splitter, and then stirring mirrors are used to properly aim the beam into photodiodes (not yet installed). This is the current configuration of the set up. |
|