ligo-ex ligo-ds
  Richardson Lab Experimental Log  Not logged in ELOG logo
Message ID: 601     Entry time: Tue Jul 1 11:04:00 2025
Author: Christina 
Type: Update 
Category: TCS 
Subject: FROSTI Reconstruction II 

[Ma, Tyler, Christina]

Finished external reconstruction of the FROSTI by installing all the pins to the 2 DB 25 connectors. To ensure everything was operating correctly, we did electrical testing by testing continuity and by checking each of the heater elements' RTD and power resistance values and comparing them to what was tabulated in January. Additionally, we organized the wires and added the stands.

Attachment 1: IMG_4042.png  11.172 MB  | Show | Show all
ELOG V3.1.3-7933898