ligo-ex ligo-ds
  Richardson Lab Experimental Log  Not logged in ELOG logo
Message ID: 59     Entry time: Fri Mar 31 14:23:13 2023
Author: Pamella 
Type: Update 
Category: General 
Subject: Clean and bake batch 11 
Today I bagged and tagged batch 11. I wiped the some tools: Centering ring alum( 2 pieces), reversible ratcheting, gasket removal (CF). After wiped that I bagged and tagged this parts and put inside the cleanroom. Also I wiped one power cable (3 meters), bagged and tagged that and inside the cleanroom. I put photo below.
Attachment 1: 4AC705B8-D906-47E3-86E4-49E4967910E7.jpeg  3.666 MB  | Show | Show all
ELOG V3.1.3-7933898