ligo-ex ligo-ds
  Richardson Lab Experimental Log  Not logged in ELOG logo
Message ID: 503     Entry time: Mon Jan 27 11:29:38 2025
Author: Xuesi Ma 
Type: Update 
Category:  
Subject: Heater Element Test 

[Ma, Cece, Luke, Mary, Shane]

On Friday (Jan 24), we installed the heater elements on the stand. The heater elements are arranged from 1 to 8, oriented from right to left as shown in Attachment 1. Each wire has been labeled according to its corresponding element number and type (e.g., RTD connections, heater connections).

Note: We currently do not have enough PEEK zip ties, so standard zip ties have been used temporarily. These must be replaced with PEEK zip ties before the setup is placed in the vacuum chamber.

Attachment 1: 20250124_165434.png  326 kB  | Show | Show all
Attachment 2: 20250124_165342.png  1.434 MB  | Show | Show all
ELOG V3.1.3-7933898