ligo-ex ligo-ds
  Richardson Lab Experimental Log  Not logged in ELOG logo
Message ID: 497     Entry time: Wed Jan 8 17:35:57 2025
Author: Luke  
Type: Summary 
Category: Cleanroom 
Subject: Cleanroom cleaning 

[Luke, Tyler, Cynthia, Shane, Michael]

Summary of Cleaning Activities:

We began cleaning Room 1119 at 2:00 PM.

At 2:30 PM, we moved to Room 1129 and continued cleaning.

Cleaning tasks included wiping down dust-collecting surfaces and vacuuming the floors.

Once the labs were clean, we proceeded to the cleanroom. 

  • Wiping down surfaces and soft walls
  • Vacuuming, mopping the floor, and finishing with IPA wipes

Particle Count Measurements:

  • Pre-cleaning (2:30 PM):
    • Zone 3:
      • 0.3 µm: 973
      • 0.5 µm: 354
      • 1.0 µm: 132
    • Zone 4:
      • 0.3 µm: 486
      • 0.5 µm: 177
      • 1.0 µm: 0
  • Post-cleaning (4:10 PM):
    • Zone 3:
      • 0.3 µm: 619
      • 0.5 µm: 132
      • 1.0 µm: 0
    • Zone 4:
      • 0.3 µm: 397
      • 0.5 µm: 0
      • 1.0 µm: 0

 

Attachment 1: partical_count_250108.png  41 kB  Uploaded Wed Jan 8 19:51:03 2025  | Show | Show all
ELOG V3.1.3-7933898