ligo-ex ligo-ds
  Richardson Lab Experimental Log  Not logged in ELOG logo
Message ID: 48     Entry time: Thu Mar 9 12:03:59 2023
Author: Peter 
Type: Update 
Category: VLC Electronics 
Subject: 532 M2 Measurements 
Took more M2 Data today. Picture of the optical set up is shown below. lens1 f = 100mm, lens2 f = 50mm, lens3 f = 150mm. There was a nice converging/diverging beam profile, and the beam waist was able to be read by the camera. I took as much data as I could before clipping loss. The M2 value is quite high.
Attachment 1: OmegaY_M2_Fit_3.png  15 kB  | Show | Hide all | Show all
Attachment 2: OmegaX_M2_Fit_3.png  16 kB  | Show | Hide all | Show all
Attachment 3: optical_setup.jpg  1.250 MB  | Hide | Hide all | Show all
optical_setup.jpg
ELOG V3.1.3-7933898