ligo-ex ligo-ds
  Richardson Lab Experimental Log  Not logged in ELOG logo
Message ID: 401     Entry time: Thu Jul 11 15:53:39 2024
Author: Luke 
Type: Update 
Category: VAC 
Subject: RGA line upgrade  

[ Luke, Jon ]

Started work at 11:00

As mentioned in my previous post the RGA was not clearing the table because of a tilt in the cross. So I removed the 90 deg elbow, loosened the bolt securing the Tee to the ZLR, and removed the cross from the gate valve. I then spun around the Tee on the bottom so that the cal leak would be pointing in the right direction and connected the rotating 2.75" flange of the cross to the gate valve. I then added the small turbo pump to the top of the cross. 

Then with the help of Dr. Richardson, we made some adjustments to how the Tee was oriented with respect to the cross and how the cross was with respect to the table. So that the cal leak and RGA would fit on the table. After that we made some changes to the bolting of the ZLR to reducing cross replacing the 2.00" bolts and nuts with 1.75" bolts and nut plates. We did face some difficulty with half of the 2.00" bolts which required a bit of torque to get them out. 

Finished work at 2:20 

 

Things to do:

Before we start pumping down the system again Dr. Richardson wanted two other changes to be made. To replace the 2.75" to 1.33" conical reducer with a zero length reducer. He also wants the bolts that hold the main turbo pump to be replaced with nut plates. 

I plan on starting this work on Friday (7/12) before pumping down over the weekend

Attachment 1: image_2024-07-11_154630323.png  2.589 MB  | Hide | Hide all | Show all
image_2024-07-11_154630323.png
Attachment 2: image_2024-07-11_154818191.png  2.815 MB  | Hide | Hide all | Show all
image_2024-07-11_154818191.png
Attachment 3: image_2024-07-11_154902840.png  1.767 MB  | Show | Hide all | Show all
ELOG V3.1.3-7933898