ligo-ex ligo-ds
  Richardson Lab Experimental Log  Not logged in ELOG logo
Message ID: 389     Entry time: Fri Jun 28 10:43:13 2024
Author: Xuejun 
Type: Update 
Category: Cleanroom 
Subject: Frosti 
[Xuejun, Tyler]

We moved Frosti into the cleanroom and debugged it to make sure everything was working. One of the DB25 pins broke off at the connector for element 1 so it needed to be recrimped. Element 6 short circuited but fixed with adjustment to the heater power pin position. We connected the power and sensor connectors to the power box and recalibrated the RTD sensors.

Attachment 1: frosti.jpg  1.066 MB  | Show | Hide all | Show all
Attachment 2: chassis.jpg  342 kB  | Hide | Hide all | Show all
chassis.jpg
ELOG V3.1.3-7933898