Entry  Mon Feb 26 21:23:27 2024, Jon, Update, TCS, FROSTI Assembly - Day 1 7x
    Reply  Wed Feb 28 17:49:18 2024, Tyler, Update, TCS, FROSTI Assembly - Days 2-3 IMG_0947.pngIMG_0956.pngIMG_0957.pngIMG_0959.png
Message ID: 345     Entry time: Wed Feb 28 17:49:18 2024     In reply to: 341
Author: Tyler 
Type: Update 
Category: TCS 
Subject: FROSTI Assembly - Days 2-3 
[Aiden, Jon, Luis, Luke, Michael, Tyler]

FROSTI assembly was completed today. The RTD and power wires were terminated at the DB-25 connectors and the legs were put on. It is currently placed in front of the stand-in test mass (~5 cm away). The FLIR has also been moved back to it's nominal position. As of now, it appears there are some shorts within the power cabling. This will be a focus of tomorrow's work.

Quote:
[Jon, Tyler, Luis, Luke, Mohak, Cynthia, Michael, Aiden]

FROSTI assembly began today. After a final set of RGA scans were taken, the vacuum chamber was vented and the reflectors were removed. The chamber was then resealed and pumped down again. 

Today we completed the installation of the Macor hardware and heater elements between the two reflector halves. Tomorrow we will route, bundle, and terminate the power and sensor cables. 

 

Attachment 1: IMG_0947.png  1.975 MB  Uploaded Wed Feb 28 23:06:35 2024  | Show | Hide all | Show all
Attachment 2: IMG_0956.png  1.777 MB  Uploaded Wed Feb 28 23:07:14 2024  | Show | Hide all | Show all
Attachment 3: IMG_0957.png  1.774 MB  Uploaded Wed Feb 28 23:07:31 2024  | Show | Hide all | Show all
Attachment 4: IMG_0959.png  1.842 MB  Uploaded Wed Feb 28 23:07:52 2024  | Hide | Hide all | Show all
IMG_0959.png
ELOG V3.1.3-7933898