ligo-ex ligo-ds
  Richardson Lab Experimental Log  Not logged in ELOG logo
Entry  Mon Feb 26 21:23:27 2024, Jon, Update, TCS, FROSTI Assembly - Day 1 7x
    Reply  Wed Feb 28 17:49:18 2024, Tyler, Update, TCS, FROSTI Assembly - Days 2-3 IMG_0947.pngIMG_0956.pngIMG_0957.pngIMG_0959.png
Message ID: 341     Entry time: Mon Feb 26 21:23:27 2024     Reply to this: 345
Author: Jon 
Type: Update 
Category: TCS 
Subject: FROSTI Assembly - Day 1 
[Jon, Tyler, Luis, Luke, Mohak, Cynthia, Michael, Aiden]

FROSTI assembly began today. After a final set of RGA scans were taken, the vacuum chamber was vented and the reflectors were removed. The chamber was then resealed and pumped down again. 

Today we completed the installation of the Macor hardware and heater elements between the two reflector halves. Tomorrow we will route, bundle, and terminate the power and sensor cables. 

Attachment 1: IMG-20240226-WA0008.jpg  201 kB  | Hide | Hide all | Show all
IMG-20240226-WA0008.jpg
Attachment 2: IMG-20240226-WA0006.jpg  202 kB  | Hide | Hide all | Show all
IMG-20240226-WA0006.jpg
Attachment 3: IMG-20240226-WA0011.jpg  231 kB  | Hide | Hide all | Show all
IMG-20240226-WA0011.jpg
Attachment 4: IMG-20240226-WA0010.jpg  102 kB  | Hide | Hide all | Show all
IMG-20240226-WA0010.jpg
Attachment 5: IMG-20240226-WA0012.jpg  203 kB  | Show | Hide all | Show all
Attachment 6: IMG_0944.png  1.991 MB  | Show | Hide all | Show all
Attachment 7: IMG_0946.png  2.046 MB  | Show | Hide all | Show all
ELOG V3.1.3-7933898