Message ID: 338     Entry time: Fri Feb 23 18:03:27 2024
Author: Tyler 
Type: Update 
Category: FLIR 
Subject: Optical Test Setup in Cleanroom 
[Tyler, Xuesi]

The FLIR and test mass stand-in have been transferred into the cleanroom. A software test will be run as soon as we get an ethernet cable long enough to reach into the cleanroom where the camera is set up. Once this is finished, the FLIR will be moved aside for construction of the FROSTI! When completed, the camera will be placed back into position for in-air optical testing.