Message ID: 323     Entry time: Tue Feb 13 11:54:45 2024
Author: Tyler 
Type: Configuration 
Category: FLIR 
Subject: In-Air Optical Test Configuration 

Below is the proposed schematic for FROSTI optical testing, chosen so enough space is allotted for prototype assembly.

Steps to be taken include:

  1. Reconstruct FLIR staging apparatus
  2. Move test mass stand-in to cleanroom
  3. Mark FLIR camera position on cleanroom optical table at correct distance
  4. Run ethernet cable into cleanroom
  5. Move FLIR aside to allow for more assembly space
  6. Upon assembly completion, reposition FLIR onto optical table again

Tentative plan is to begin setup early next week.

Attachment 1: In-air_optical_test_sketch.png  12 kB  | Show | Show all