ligo-ex ligo-ds
  Richardson Lab Experimental Log  Not logged in ELOG logo
Message ID: 30     Entry time: Fri Feb 17 19:12:39 2023
Author: Aiden 
Type: Update 
Category: General 
Subject: Clean and Bake batch 3 
Bagged and Tagged batch 2 parts by placing no more than two parts per ESD bag then taped them with kapton tape and tagged them with their name and part number. Than placed them inside the clean room on the work bench. Total of 3 Bags used. For Batch 3- Cleaned all copper gaskets with liquinox for 10 minutes, dried them off with nitrogen, then placed into oven where the are currently undergoing the following steps; 1. Ramp to 100 deg C in 15 minutes. 2. Dwell at 100 degC for 30 minutes. 3. Ramp to 175 degC in 30 minutes. 4. Dwell at 175 degC for 24 hours. 5. Turn off and cool down to room temperature. To see the specific parts in batches 2 and 3 refer to the clean and bake data sheet. https://docs.google.com/spreadsheets/d/19gnv1q9l64gxnq76KfcXizbqShJfK0ayn2Js1SiAZok/edit?skip_itp2_check=true#gid=1549161924
Attachment 1: IMG_4126.jpg  123 kB  | Show | Hide all | Show all
Attachment 2: IMG_4125.jpg  79 kB  | Hide | Hide all | Show all
IMG_4125.jpg
ELOG V3.1.3-7933898