ligo-ex ligo-ds
  Richardson Lab Experimental Log  Not logged in ELOG logo
Message ID: 278     Entry time: Mon Nov 27 14:22:30 2023
Author: Tyler 
Type: Update 
Category: Lore 
Subject: 1129 Assembly Update 
[Tyler, Michael, Luke, Cynthia]

The tabletops have been attached to the workbench frames. Unfortunately, one of the tabletops came out of the box with a large scratch and small dent in the middle. One of the electric top shelves is ready to be attached to the undamaged table, but the other is yet to be opened. Assembly will be completed Wednesday morning.

Attachment 1: IMG_7669.jpg  1022 kB  | Hide | Hide all
IMG_7669.jpg
Attachment 2: IMG_7668.jpg  830 kB  | Hide | Hide all
IMG_7668.jpg
ELOG V3.1.3-7933898