ligo-ex ligo-ds
  Richardson Lab Experimental Log  Not logged in ELOG logo
Message ID: 250     Entry time: Mon Oct 30 18:15:13 2023
Author: Shane 
Type: Update 
Category: CDS 
Subject: CyMAC chassis mounted and progress on power connections 
All CyMAC chassis mounted in electronics rack today, and shelf for monitor also mounted. Images attached. Assembled grounding cables for power connections, and attached the timing chassis to power & gnd. Powered on successfully with correct voltages in expected places. After power test, everything was turned off and unplugged. Next steps: attach grounding cables to other four power supply chassis. Also attach anti-aliasing, anti-imaging, binary input and binary output chassis to power supply.
Attachment 1: electronics_rack_back.jpeg  2.978 MB  | Show | Hide all | Show all
Attachment 2: electronics_rack_front.jpeg  2.678 MB  | Hide | Hide all | Show all
electronics_rack_front.jpeg
Attachment 3: mounted_chassis.jpeg  2.726 MB  | Show | Hide all | Show all
Attachment 4: power_supply.jpeg  2.744 MB  | Show | Hide all | Show all
ELOG V3.1.3-7933898