ligo-ex
ligo-ds
|
Richardson Lab Experimental Log |
Not logged in |
|
|
Message ID: 244
Entry time: Mon Oct 23 18:02:23 2023
|
Author: |
Shane, Jon |
Type: |
Update |
Category: |
CDS |
Subject: |
Timing chassis assembly complete |
|
|
Concluded assembly of timing chassis for CyMAC today; see attachment 1 for interior set up of chassis. Installed front and rear panels, wired on/off switch and LED assembly, and tested to confirm everything is powering on correctly. Also tested the outputted timing reference that will go to DAC and ADC adapter boards (see attachment 2 for output 1 and attachment 3 for output 2). |
|
|
|
|
|
|