ligo-ex ligo-ds
  Richardson Lab Experimental Log  Not logged in ELOG logo
Message ID: 244     Entry time: Mon Oct 23 18:02:23 2023
Author: Shane, Jon 
Type: Update 
Category: CDS 
Subject: Timing chassis assembly complete 
Concluded assembly of timing chassis for CyMAC today; see attachment 1 for interior set up of chassis. Installed front and rear panels, wired on/off switch and LED assembly, and tested to confirm everything is powering on correctly. Also tested the outputted timing reference that will go to DAC and ADC adapter boards (see attachment 2 for output 1 and attachment 3 for output 2).
Attachment 1: timing_chassis_complete.jpeg  3.427 MB  | Hide | Hide all | Show all
timing_chassis_complete.jpeg
Attachment 2: timing_chassis_output_1.jpeg  1.450 MB  | Show | Hide all | Show all
Attachment 3: timing_chassis_output_2.jpeg  1.721 MB  | Hide | Hide all | Show all
timing_chassis_output_2.jpeg
ELOG V3.1.3-7933898