ligo-ex ligo-ds
  Richardson Lab Experimental Log  Not logged in ELOG logo
Message ID: 231     Entry time: Fri Sep 29 17:27:30 2023
Author: Shane, Jon 
Type: Update 
Category: CDS 
Subject: Timing chassis assembly progress (CyMAC) 
Worked on timing chassis assembly today for the CyMAC, settled on layout (see attachment 1). Frequency synthesizer and frequency divider tentatively mounted. Next steps involve putting together and installing an LED and DC on/off switch assembly like the one in the binary input chassis (attachment 2 for comparison; orange and black wires in BI chassis analogous to red and black wires in timing chassis). Will also use front and back panels of BI chassis as a template for the timing chassis panels, with the following alterations: two SMB feedthroughs in place of the ribbon cable connections shown on the back panel, the addition of an LED on the front panel to indicate power, and potentially a spot on the front panel for usb connection to programmable frequency synthesizer.
Attachment 1: timing_chassis.jpeg  3.157 MB  | Hide | Hide all
timing_chassis.jpeg
Attachment 2: BI_chassis.jpeg  3.373 MB  | Hide | Hide all
BI_chassis.jpeg
ELOG V3.1.3-7933898