ligo-ex ligo-ds
  Richardson Lab Experimental Log  Not logged in ELOG logo
Message ID: 199     Entry time: Wed Aug 9 17:35:26 2023
Author: Shane 
Type: Update 
Category: CDS 
Subject: Binary output chassis finished 
Finished the internal wiring for the binary output chassis today, which completes its assembly. Also secured ribbon cables and chassis lid with their respective screws. Note: one of the spade lugs' internal metal piece is a little loose and had to be reinserted after falling out once. Seemed secure after this, and I checked continuity on everything and it was all good.
Attachment 1: IMG_8685.jpeg  3.489 MB  | Show | Hide all | Show all
Attachment 2: IMG_8686.jpeg  3.243 MB  | Hide | Hide all | Show all
IMG_8686.jpeg
ELOG V3.1.3-7933898