Message ID: 124
Entry time: Wed Jun 14 15:35:36 2023
|
Author: |
Pamella |
Type: |
Update |
Category: |
VAC |
Subject: |
Heating system installation |
|
|
[Pamella and Cao]
Heating system installation - Second day.
- Today we kept installing the equipment for the heating system.
- First: Started installing the two heating cable around the chamber vacuum, the arms and covered it with aluminum tape.
- Second: Started installing the insulation stuff around the vacuum chamber and around the connections points (the arms) in the vacuum chamber.
- Third:Started installing the heater system (electronic device) and tried testing.
-
Note: The around part of the chamber vacuum was difficult to cover, so we spent a little time on. Also one heater system electronic device wasn't working because one fuse is burned so we could not finished this part and we need wait for a new one to replace and working on it.
|
|
|