ligo-ex ligo-ds
  Richardson Lab Experimental Log  Not logged in ELOG logo
Message ID: 122     Entry time: Tue Jun 13 21:08:46 2023
Author: Pamella 
Type: Infrastructure 
Category: VAC 
Subject: Heater system - Installation 
[Pamella, Cao and Jon]
    Heating system installation
  • Today we started installing the equipments for the heating system.
  • First: Started installing the heating cable on the top lid and covered it with aluminum tape.
  • Second: Started installing the insulation cover on top of the chamber lid.
  • Third:Started installing the heating cable from under the vacuum chamber and covered with aluminum tape.
  • Forth: Started installing the insulation cover under the vacuum chamber
  • Note: The under part of the chamber vacuum was very difficult to cover, so we spent a little time on it and we couldn't finish the whole installation today. So tomorrow we should be able to keep doing the installation.
Attachment 1: IMG_7563.jpeg  2.896 MB  | Hide | Hide all | Show all
IMG_7563.jpeg
Attachment 2: IMG_7561.jpeg  3.064 MB  | Show | Hide all | Show all
ELOG V3.1.3-7933898