ligo-ex ligo-ds
  Richardson Lab Experimental Log  Not logged in ELOG logo
Message ID: 106     Entry time: Wed May 24 14:06:27 2023
Author: Pamella 
Type: Update 
Category: FLIR 
Subject: FLIR project - Tests 
[Pamella]
    Initial tests
  • 10:30 am : Started trying take some test with the new position/configuration between the 3D reflector-mask and the FLIR camera.
  • 10:41 am : Started running the python code and take a snap. Parameters: 0.10 A, 1.4 V.
  • 10:50 am : Started take the snap.It is possible see the triangles, this is a good thing. Negative thing: The middle/center point for the light maybe would be some problems for the future measurements. Parameters: 0.10A, 1.4 V and 41 C.
  • 11:00 am : Started working to better align the entire structure. And double-check the distance between the 3D reflector-mask and the FLIR camera, following the instructions in Cassidy's Final FLIR Project Report.
  • 11:10 am : Difficult point: I tried to attach the complete FLIR camera to the table, but I had a problem to secure the four screws to the table, the distance is not completely compatible with the table stand. Yesterday I just put two screws in the diagonal position, it works fine, but it's not the correct position to work.
  • 12:00 am : Note: Two triangles take more long time to come back a not (low) irradiation position (east and south point).
  • 2:00 pm : Started running the python code again.
  • Parameters: 0.13 A 1.8 V.
  • 2:30 pm: Started take snap. Parameters: 0.13 A, 1.8 V and 49.1 C
  • 3:00 pm: Note: This time every triangles was able to come back a low irradiation position.
Attachment 1: AcquisitionImage(May-24-2023_10_50).jpg  29 kB  | Hide | Hide all | Show all
AcquisitionImage(May-24-2023_10_50).jpg
Attachment 2: thumbnail_IMG-7146.jpg  441 kB  | Hide | Hide all | Show all
thumbnail_IMG-7146.jpg
Attachment 3: AcquisitionImage(May-24-2023_14_30).jpg  29 kB  Uploaded Wed May 24 16:00:51 2023  | Show | Hide all | Show all
ELOG V3.1.3-7933898